L

Longhorn Solar

· Solar Installers
Claimed Verified

14+ yrs

Experience

89 reviews

4.6 avg rating

11-50

Employees

4.6
89 reviews
Est. 2012

SurgePV Score

5.5 / 10
Customer Reviews 92%
Certifications 25%
Experience 93%
Services Range 20%
Warranty Coverage 0%
Online Presence 50%

About Longhorn Solar

Longhorn Solar is an Austin-based solar installation company focused on making clean energy accessible to Central Texas homeowners. We offer customized solar solutions, financing options, and a lifetime workmanship warranty on every installation. Our team of NABCEP-certified installers has completed over 3,000 residential projects.

Services Offered

Solar Installers

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Customer Reviews

View all 89 reviews →
4.6

89 reviews

5
0
4
0
3
0
2
0
1
0

No reviews yet. Be the first to review Longhorn Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Longhorn Solar?

You can request a free quote by filling out the form on this page or contacting Longhorn Solar directly via phone or email. Most installers provide a free initial consultation and site assessment.

What areas does Longhorn Solar serve?

Longhorn Solar is based in your area. Check the Service Areas section above for a complete list of locations.

What certifications does Longhorn Solar hold?

Longhorn Solar meets all required local licensing and insurance requirements for solar installation work.

What warranty does Longhorn Solar offer?

Longhorn Solar provides standard manufacturer warranties on all equipment plus workmanship coverage. Contact them directly for specific warranty details.

How long does installation take?

Most residential solar installations are completed within 1-3 days after permits are approved. The full timeline from consultation to activation typically ranges from 4-12 weeks depending on local permitting and utility interconnection processes.

Does Longhorn Solar handle permits and paperwork?

Yes, most solar installers including Longhorn Solar handle all necessary permits, utility interconnection applications, and incentive paperwork as part of their service. Confirm specific details during your consultation.

Business Details

Founded 2012
Employees 11-50
Profile Status Unclaimed
Verification Level 4/6
Profile Complete 85%

Trust Score

4.5 / 5.0

Based on verified reviews, certifications, and business history.

Get a Free Quote from Longhorn Solar

Fill out the form below and Longhorn Solar will contact you within 24-48 hours.

For Longhorn Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
L

Longhorn Solar

4.6 (89)
Get a Free Quote