IM-EL Osasio Srl in Turin
51+ yrs
Experience
50 km
Service radius
11-50
Employees
Profile information
About IM-EL Osasio Srl
Dal 1975 impianti elettrici e fotovoltaici — partner SunPower e Tesla nel Torinese
Turin, Piedmont 10040
Turin, Piedmont 10040
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Inverters
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review IM-EL Osasio Srl!
Frequently Asked Questions
How do I get a quote from IM-EL Osasio Srl?
You can request a quote through the form on this page or contact IM-EL Osasio Srl directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does IM-EL Osasio Srl serve?
IM-EL Osasio Srl is based in Turin and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does IM-EL Osasio Srl hold?
This profile lists the following reported certifications: SunPower Elite Partner, Mennekes Quality Partner. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does IM-EL Osasio Srl offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask IM-EL Osasio Srl for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask IM-EL Osasio Srl for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does IM-EL Osasio Srl handle permits and paperwork?
The exact scope is not verified on this profile. Ask IM-EL Osasio Srl which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from IM-EL Osasio Srl
Send your project details to request follow-up from IM-EL Osasio Srl. Response timing and consultation terms are set by the company.
For IM-EL Osasio Srl
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
IM-EL Osasio Srl