H

Hürter electric GmbH in Bonn

Bonn, North Rhine-Westphalia·Solar Installation
ResidentialCommercial

96+ yrs

Experience

30 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Hürter electric GmbH

Elektrofachbetrieb mit Photovoltaik seit 1930 in Bonn-Oberkassel

Bonn, North Rhine-Westphalia 53227

Bonn, North Rhine-Westphalia 53227

Services Offered

Solar InstallationBattery Storageelectrical_installationwallboxMaintenance

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Bonn, North Rhine-WestphaliaKönigswinter, North Rhine-WestphaliaBad Honnef, North Rhine-WestphaliaSankt Augustin, North Rhine-Westphalia

Customer Reviews

No reviews yet. Be the first to review Hürter electric GmbH!

Write a Review

Frequently Asked Questions

How do I get a quote from Hürter electric GmbH?

You can request a quote through the form on this page or contact Hürter electric GmbH directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Hürter electric GmbH serve?

Hürter electric GmbH is based in Bonn and serves within a 30 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Hürter electric GmbH hold?

This profile does not list independently verified certifications. Ask Hürter electric GmbH for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Hürter electric GmbH offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Hürter electric GmbH for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Hürter electric GmbH for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Hürter electric GmbH handle permits and paperwork?

The exact scope is not verified on this profile. Ask Hürter electric GmbH which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded1930
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Hürter electric GmbH

Send your project details to request follow-up from Hürter electric GmbH. Response timing and consultation terms are set by the company.

For Hürter electric GmbH

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
H

Hürter electric GmbH

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.