H

HTC S.r.l. in Perugia

Perugia, Umbria·Solar Installation
ResidentialCommercial

10+ yrs

Experience

40 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About HTC S.r.l.

Installazione di impianti fotovoltaici e colonnine di ricarica per residenziale e commerciale a Perugia dal 2016

Perugia, Umbria 06135

Perugia, Umbria 06135

Services Offered

Solar InstallationEV Chargingsolar_consultation

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Inverters

Azzurro

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Perugia, UmbriaPonte San Giovanni, UmbriaPonte Felcino, UmbriaBosco, UmbriaPretola, Umbria

Customer Reviews

No reviews yet. Be the first to review HTC S.r.l.!

Write a Review

Frequently Asked Questions

How do I get a quote from HTC S.r.l.?

You can request a quote through the form on this page or contact HTC S.r.l. directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does HTC S.r.l. serve?

HTC S.r.l. is based in Perugia and serves within a 40 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does HTC S.r.l. hold?

This profile does not list independently verified certifications. Ask HTC S.r.l. for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does HTC S.r.l. offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask HTC S.r.l. for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask HTC S.r.l. for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does HTC S.r.l. handle permits and paperwork?

The exact scope is not verified on this profile. Ask HTC S.r.l. which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2016
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from HTC S.r.l.

Send your project details to request follow-up from HTC S.r.l.. Response timing and consultation terms are set by the company.

For HTC S.r.l.

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
H

HTC S.r.l.

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.