e

enerix Berlin in Berlin

Berlin, Berlin·Solar Installation
ResidentialCommercial

11+ yrs

Experience

60 km

Service radius

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About enerix Berlin

Regionaler Fachbetrieb für Photovoltaik, Stromspeicher und Wallboxen in Berlin

Berlin, Berlin 12489

Berlin, Berlin 12489

Services Offered

Solar InstallationBattery StorageEV Charging

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Berlin, BerlinPotsdam, BerlinOranienburg, BerlinLuckenwalde, BerlinFalkensee, Berlin

Customer Reviews

No reviews yet. Be the first to review enerix Berlin!

Write a Review

Frequently Asked Questions

How do I get a quote from enerix Berlin?

You can request a quote through the form on this page or contact enerix Berlin directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does enerix Berlin serve?

enerix Berlin is based in Berlin and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does enerix Berlin hold?

This profile does not list independently verified certifications. Ask enerix Berlin for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does enerix Berlin offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask enerix Berlin for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask enerix Berlin for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does enerix Berlin handle permits and paperwork?

The exact scope is not verified on this profile. Ask enerix Berlin which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2015
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from enerix Berlin

Send your project details to request follow-up from enerix Berlin. Response timing and consultation terms are set by the company.

For enerix Berlin

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
e

enerix Berlin

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.