E

Elettro M2 S.r.l. in Trento

Trento, Trentino-Alto Adige·Solar Installation
Residential

17+ yrs

Experience

50 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Elettro M2 S.r.l.

Azienda familiare con oltre 200 impianti installati — partner Tesla e SunPower in Trentino

Trento, Trentino-Alto Adige 38067

Trento, Trentino-Alto Adige 38067

Services Offered

Solar InstallationBattery StorageMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Tesla PartnerSunPower Partner

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SunPower

Batteries

Tesla

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Trento, Trentino-Alto AdigeLedro, Trentino-Alto AdigeRiva del Garda, Trentino-Alto AdigeArco, Trentino-Alto AdigeNago-Torbole, Trentino-Alto Adige

Customer Reviews

No reviews yet. Be the first to review Elettro M2 S.r.l.!

Write a Review

Frequently Asked Questions

How do I get a quote from Elettro M2 S.r.l.?

You can request a quote through the form on this page or contact Elettro M2 S.r.l. directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Elettro M2 S.r.l. serve?

Elettro M2 S.r.l. is based in Trento and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Elettro M2 S.r.l. hold?

This profile lists the following reported certifications: Tesla Partner, SunPower Partner. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Elettro M2 S.r.l. offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Elettro M2 S.r.l. for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Elettro M2 S.r.l. for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Elettro M2 S.r.l. handle permits and paperwork?

The exact scope is not verified on this profile. Ask Elettro M2 S.r.l. which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2009
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Elettro M2 S.r.l.

Send your project details to request follow-up from Elettro M2 S.r.l.. Response timing and consultation terms are set by the company.

For Elettro M2 S.r.l.

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

Elettro M2 S.r.l.

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.