E

Energiekonzepte Deutschland GmbH (EKD) in Leipzig

Leipzig, Saxony·Solar Installation
Residential

8+ yrs

Experience

200 km

Service radius

201-500

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Energiekonzepte Deutschland GmbH (EKD)

Einer der größten Photovoltaik-Anbieter Deutschlands mit Hauptsitz in Leipzig — über 40.000 installierte Solaranlagen

Leipzig, Saxony 04347

Leipzig, Saxony 04347

Services Offered

Solar InstallationBattery Storageheat_pumpplanning

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

15yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Leipzig, SaxonyDresden, SaxonyBerlin, SaxonyHalle, Saxony

Customer Reviews

No reviews yet. Be the first to review Energiekonzepte Deutschland GmbH (EKD)!

Write a Review

Frequently Asked Questions

How do I get a quote from Energiekonzepte Deutschland GmbH (EKD)?

You can request a quote through the form on this page or contact Energiekonzepte Deutschland GmbH (EKD) directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Energiekonzepte Deutschland GmbH (EKD) serve?

Energiekonzepte Deutschland GmbH (EKD) is based in Leipzig and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Energiekonzepte Deutschland GmbH (EKD) hold?

This profile does not list independently verified certifications. Ask Energiekonzepte Deutschland GmbH (EKD) for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Energiekonzepte Deutschland GmbH (EKD) offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Energiekonzepte Deutschland GmbH (EKD) for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Energiekonzepte Deutschland GmbH (EKD) for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Energiekonzepte Deutschland GmbH (EKD) handle permits and paperwork?

The exact scope is not verified on this profile. Ask Energiekonzepte Deutschland GmbH (EKD) which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2018
Employees201-500
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Energiekonzepte Deutschland GmbH (EKD)

Send your project details to request follow-up from Energiekonzepte Deutschland GmbH (EKD). Response timing and consultation terms are set by the company.

For Energiekonzepte Deutschland GmbH (EKD)

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

Energiekonzepte Deutschland GmbH (EKD)

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.