E

E-PN GmbH in Regensburg

Regensburg, Bavaria·Solar Installation
ResidentialCommercial

6+ yrs

Experience

50 km

Service radius

1-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About E-PN GmbH

Photovoltaik, Stromspeicher und Wallboxen aus Regensburg

Regensburg, Bavaria 93055

Regensburg, Bavaria 93055

Services Offered

Solar InstallationBattery Storagecharging_infrastructuresolar_consultation

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Regensburg, BavariaNeutraubling, BavariaRegenstauf, BavariaKelheim, BavariaSchwandorf, Bavaria

Customer Reviews

No reviews yet. Be the first to review E-PN GmbH!

Write a Review

Frequently Asked Questions

How do I get a quote from E-PN GmbH?

You can request a quote through the form on this page or contact E-PN GmbH directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does E-PN GmbH serve?

E-PN GmbH is based in Regensburg and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does E-PN GmbH hold?

This profile does not list independently verified certifications. Ask E-PN GmbH for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does E-PN GmbH offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask E-PN GmbH for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask E-PN GmbH for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does E-PN GmbH handle permits and paperwork?

The exact scope is not verified on this profile. Ask E-PN GmbH which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2020
Employees1-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from E-PN GmbH

Send your project details to request follow-up from E-PN GmbH. Response timing and consultation terms are set by the company.

For E-PN GmbH

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

E-PN GmbH

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.