CREA Energia Srl in Modena
16+ yrs
Experience
40 km
Service radius
11-50
Employees
Profile information
About CREA Energia Srl
Progettazione e installazione di impianti fotovoltaici residenziali, commerciali e industriali a Formigine dal 2010
Modena, Emilia-Romagna 41043
Modena, Emilia-Romagna 41043
Services Offered
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review CREA Energia Srl!
Frequently Asked Questions
How do I get a quote from CREA Energia Srl?
You can request a quote through the form on this page or contact CREA Energia Srl directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does CREA Energia Srl serve?
CREA Energia Srl is based in Modena and serves within a 40 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does CREA Energia Srl hold?
This profile does not list independently verified certifications. Ask CREA Energia Srl for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does CREA Energia Srl offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask CREA Energia Srl for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask CREA Energia Srl for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does CREA Energia Srl handle permits and paperwork?
The exact scope is not verified on this profile. Ask CREA Energia Srl which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from CREA Energia Srl
Send your project details to request follow-up from CREA Energia Srl. Response timing and consultation terms are set by the company.
For CREA Energia Srl
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
CREA Energia Srl