Permit Design Set
A Permit Design Set is the complete package of solar engineering drawings, technical documentation, and compliance notes required by the Authority Having Jurisdiction (AHJ) to approve a solar project for installation. It includes site layouts, structural plans, electrical one-line diagrams, equipment schedules, stringing details, safety labels, and code references—everything an AHJ needs to verify that a system is safe, code-compliant, and ready to build.
In modern solar designing workflows, the Permit Design Set is the critical bridge between sales approval and on-site construction. High-quality permit packages reduce AHJ revisions, accelerate approvals, and ensure compliance with NEC, fire codes, and utility interconnection rules—directly improving project timelines and installation efficiency.
Key Takeaways
- A Permit Design Set is mandatory for AHJ approval before installation.
- It includes site plans, structural layouts, electrical diagrams, and compliance documentation.
- High-quality permit sets reduce revisions and delays.
- Larger systems require deeper engineering detail.
- Clear, accurate designs lead to faster approvals and smoother installations.

What It Is
A Permit Design Set is a standardized collection of solar engineering documents prepared for residential solar, commercial solar, or utility-scale projects. It is typically generated after Shadow Analysis, Solar Layout Optimization, equipment selection, and Stringing & Electrical Design are finalized.
A typical Permit Design Set includes:
- Cover sheet with project metadata
- Site plan and roof plan
- Structural layout and mounting structure details
- PV array configuration
- Electrical one-line diagrams
- Conduit, wiring, and interconnection plans
- Safety labeling and NEC code notes
- Equipment datasheets
- Utility and AHJ compliance sheets
For solar designers, installers, and EPC teams, this document set is mandatory before installation can legally begin.
How It Works
A Permit Design Set is created once the system design is finalized and ready for engineering validation. In professional solar project planning, the workflow typically follows these steps:
1. Site Assessment & Layout Finalization
Designers finalize module placement using Solar Layout Optimization while accounting for setbacks, walkways, tilt, roof geometry, and shade impact identified through Shadow Analysis.
2. Electrical & Stringing Configuration
The electrical design team prepares inverter selection, conductor sizing, grounding methods, breaker ratings, and string layouts using Stringing & Electrical Design best practices.
Tools such as the Voltage Drop Calculator and AC Size Calculator are often used to validate electrical limits.
3. Structural Analysis & Mounting Selection
Structural loads, attachment spacing, racking systems, and roof conditions are documented—especially critical for rooftop systems using different mounting structures.
4. Code Compliance Review
The design is reviewed against NEC, fire, and AHJ requirements, including:
- Roof access pathways
- Rapid shutdown rules
- Conductor ampacity limits
- Required labeling and placards
This step ensures full AHJ compliance before submission.
5. Drawing Set Assembly
All sheets—cover page, site plan, array layout, electrical diagrams, structural notes, and datasheets—are compiled into one coordinated engineering package.
6. AHJ / Utility Submission
The Permit Design Set is submitted to the AHJ or utility portal. Any requested changes result in revision sets until final approval is granted.
Types / Variants
1. Residential Permit Design Set
Compact packages (usually 3–10 sheets) including roof plans, array layouts, electrical one-lines, and equipment datasheets—commonly used by solar installers.
2. Commercial Permit Design Set
More detailed documentation with structural load calculations, fire setback plans, multiple inverter configurations, and expanded electrical diagrams.
3. Utility-Scale Permit Package
Large-scale engineering documentation that may include:
- Civil grading plans
- Medium-voltage layouts
- String maps
- SCADA architecture
- Interconnection design
These sets can exceed 100+ pages and require extensive coordination.
4. Revision Sets (R1, R2, etc.)
Updated drawings requested by AHJs or utilities—often addressing labeling, conductor sizing, or clearance clarifications.
How It’s Measured
A Permit Design Set is evaluated qualitatively rather than numerically, based on:
Completeness
Does it include every sheet required by the AHJ?
Compliance
Does it fully satisfy NEC, building codes, and local regulations?
Accuracy
Are electrical values, layouts, and equipment selections correct?
Clarity
Are drawings easy for AHJ reviewers and installers to interpret?
Approval Time
The most important outcome metric:
Fewer revisions → faster approval → shorter project timelines.
Practical Guidance
For Solar Designers
- Finalize stringing early to avoid repeated revisions.
- Use Shadow Analysis to prevent layout-related compliance issues.
- Keep one-line diagrams standardized and readable.
For Installers
- Verify that the equipment installed matches the Permit Design Set.
- Follow conduit routing, attachment spacing, and labeling exactly.
For EPCs
- Standardize engineering templates to reduce turnaround time.
- Maintain NEC and AHJ checklists to minimize revisions.
For Sales Teams
- Ensure sold layouts align with engineering feasibility.
- Unrealistic layouts often lead to redesigns and delays in solar proposals.
For Project Managers
- Track AHJ response times and revision cycles.
- Use the Permit Design Set to coordinate construction schedules across teams.
Real-World Examples
Residential Rooftop System (6 kW)
A designer prepares a 10-page Permit Design Set with roof layout, array plan, electrical one-line, and datasheets. Because the design follows standard setbacks and clean wiring practices, the AHJ approves it within three days.
Commercial Flat Roof System (200 kW)
The permit package includes ballast calculations, fire access pathways, inverter block diagrams, and multi-sheet electrical plans. A minor clearance revision is requested, and approval is granted in two weeks.
Utility-Scale Ground-Mount System (5 MW)
The engineering team produces over 100 pages of civil, structural, and electrical documentation. Medium-voltage routing, SCADA diagrams, and interconnection drawings are reviewed in depth, resulting in a two-month approval timeline.