Product Updates
What's New at SurgePV
Monthly releases covering new features, performance improvements, and platform expansions. See what we've shipped and what's coming next.
v3.2 May 2026
- Utility-scale solar design: terrain modeling, tracker layout, and central inverter selection for 1 MW–1+ GW projects
- DWG/DXF export for AutoCAD integration — permit-ready drawings with AIA-standard layers
- Enhanced 3D roof detection with LiDAR fallback for ±5cm accuracy on complex commercial roofs
v3.1 April 2026
- Clara AI 2.0: 40% faster roof detection, improved obstruction handling for dormers and skylights
- String sizing calculator now supports NEC 2023 and IEC 60364 compliance modes
- New battery arbitrage modeling for European markets with time-of-use tariffs
v3.0 March 2026
- Complete UI refresh with dark mode support and improved mobile responsiveness
- Multi-language proposal generation: DE, IT, FR, ES, PT, PL, TR, AR
- Integration with European solar incentive databases (Italy Superbonus, Spain IRPF, Germany EEG)
v2.9 February 2026
- Commercial solar design: carport, tracker, and ground-mount layout optimization
- New financial modeling: LCOE, IRR, NPV with sensitivity analysis and PPA pricing
- Solar installer directory launch: 1,796 verified profiles across US, UK, Germany, and Italy
v2.8 January 2026
- Solar compliance hub: NEC 690 guides, state permits, and AHJ requirements for all 50 US states
- Glossary expansion to 399 terms with FAQ schema and citation blocks
- AI-powered proposal builder with branded templates and real-time financing scenarios
v2.7 December 2025
- Shading analysis tool: 8760-hour simulation with near/far shading and horizon profiles
- Bifacial gain calculator with albedo modeling and rear-side irradiance estimation
- New blog engine with reading progress, sticky CTA, and related content modules
v2.6 November 2025
- 3D solar roof design AI: address-to-layout in under 60 seconds with satellite imagery
- Electrical SLD auto-generation with NEC compliance and rapid-shutdown labeling
- Solar proposal software: drag-and-drop editor with custom branding and e-signature
v2.5 October 2025
- Shadow analysis with terrain-following for sloped ground-mount sites
- Energy yield simulation calibrated to ±3% of PVsyst on identical inputs
- Import GIS shapefiles, KML, and GeoJSON for site boundary definition
v2.0 July 2025
- SurgePV 2.0 launch: unified platform combining design, simulation, and proposals
- Cloud-based architecture: no installation, works on Mac, Windows, Linux, and tablets
- Team collaboration: shared projects, version history, and role-based access control
v1.0 January 2025
- SurgePV 1.0 beta: AI-powered residential solar design with auto-roof detection
- Basic proposal generation with system specs and financial projections
- First 100 beta customers across Germany, Italy, and the United States
Want Early Access to New Features?
Book a demo and we'll show you the latest SurgePV capabilities — including features not yet in the public changelog.
Book a Free DemoNo commitment · Live walkthrough · ~20 minutes