Utility-Scale · Spain

Bankable Yield Reports in 3 Days Instead of 3 Weeks

A Madrid-based developer cut bankable P50/P90 report preparation from 3 weeks to 3 days by replacing their PVsyst + CAD + Excel stack.

3 days

Report Turnaround

3 weeks

Previous Turnaround

±3%

vs PVsyst Accuracy

The Challenge

Iberia Solar Developments was losing financing windows because bankable yield reports took 3 weeks to prepare. The process involved terrain surveys in CAD, layout optimization in a separate tool, yield simulation in PVsyst, and report compilation in Excel — with handoffs between 4 different engineers.

The Switch to SurgePV

The team consolidated the entire workflow into SurgePV: terrain import from GIS shapefiles, tracker layout optimization, central inverter selection, and yield simulation — all in one platform. The final report exports directly to the PDF format their independent engineer expects.

The Results

Report preparation time dropped from 3 weeks to 3 days. The team closed financing on 2 projects that would have missed their funding windows under the old timeline. Independent engineer review time also shortened because SurgePV reports follow standard bankable report formatting.

Key SurgePV Features Used

  • GIS terrain import (SHP/KML) with elevation modeling
  • Single-axis tracker layout with terrain-following logic
  • Central inverter database (Sungrow, SMA, Power Electronics)
  • P50/P90 yield simulation with Meteonorm 8 TMY data
  • Auto-generated bankable report with loss table and PR breakdown