For commercial projects where utility tariffs and storage drive the result, look at Energy Toolbase. A tariff is the utility’s published rate schedule. Energy Toolbase documents a database of more than 110,000 utility rates and demand-charge modeling. A demand charge is the part of a bill based on your highest power use.
For residential sales with financing and bill comparison inside the proposal, look at Aurora Solar. HelioScope names IRR (internal rate of return, a yearly return rate) and LCOE (levelized cost of energy) in its sales tools. SAM calculates NPV (net present value), LCOE and payback for free on the desktop. OpenSolar’s core app is free of charge. Sunbase lists payback and ROI (return on investment) in its proposals from $59 per user per month.
SurgePV fits teams that want financial modeling in the same web application as design and proposals. Its verified product scope does not itemise payback or IRR outputs. Ask for them in a demo.
Every tool rests on one formula, simple payback. It is the net system cost divided by the annual savings. The tools differ in what they add on top. The add-ons are tariffs, escalation (power prices that rise each year), degradation (output that falls each year), financing and tax treatment.
This is a desk comparison of what each vendor publishes, checked October 2026. We have not run side-by-side tests.
Criteria used: payback, IRR and NPV outputs, utility-rate handling, financing in the proposal, delivery (web or desktop), and published price.
Want to see SurgePV on your own ROI quote?
Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks by Use Case
- Commercial and storage projects where the tariff decides the result: Energy Toolbase. Its ETB Developer page documents time-of-use modeling and a utility-rate database. It also documents demand-charge reduction through simulated battery dispatch.
- Residential sales proposals with financing and bill comparison: Aurora Solar. Its Sales Mode lists financing and energy bill comparisons. It also lists integrated financing from GoodLeap, Dividend and Mosaic, and a utility rate database.
- Commercial design with IRR and LCOE shown beside the layout: HelioScope. Its sales page says users can see how each design change affects IRR, LCOE and other key metrics. Its Pro plan lists financial modeling and sales proposals.
- A free core app for a first proposal workflow: OpenSolar. Its home page states the core app is free of charge for solar professionals. API Access and connectors are charged from 16 April 2026. Its proposal lets customers compare financing options. Its Help Center lists payback, NPV (net present value) and IRR (yearly return rate) among the proposal figures.
- Free techno-economic analysis on the desktop: SAM. It calculates LCOE, NPV and payback period. It also includes an electricity bill calculator with net metering (a billing method that credits power you send back to the grid) and net billing options.
- CRM (customer relationship management), estimating and proposals with savings, payback and ROI in one system: Sunbase. Its solar proposal page lists projected savings, cash flow, payback period and ROI.
- Financial modeling in the same web application as design and proposals: SurgePV. Its listed scope covers 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling and proposal generation. Energy Toolbase is the better documented fit when tariff detail is the main requirement.
Comparison Table
The tools are listed alphabetically. This is not a ranking. Pick by the situation above.
| Tool | Best for | Price (checked October 2026) | Free or paid | Decisive scope fact |
|---|---|---|---|---|
| Aurora Solar | Residential sales proposals | Basic $135 per user per month billed annually ($1,620 per year); Premium $220 per user per month billed annually ($2,640 per year); monthly billing $159 and $259 (aurorasolar.com, North America view) | Paid | Financing and energy bill comparisons, and a utility rate database, in Sales Mode |
| Energy Toolbase | Commercial and storage tariff modeling | Not published for ETB Developer; pricing is given on a call (energytoolbase.com) | Paid | Time-of-use and demand-charge modeling with a utility-rate database |
| HelioScope | Commercial design with IRR and LCOE | Basic $1,620 per license per year; Pro $2,640 per license per year (helioscope.aurorasolar.com) | Paid; 14-day free trial (help center) | Financial modeling and sales proposals are listed on Pro and Enterprise |
| OpenSolar | Proposal workflow with a free core app | Core app free of charge for solar professionals (opensolar.com); API Access and connectors charged from 16 April 2026 (vendor post) | Free core app; paid API Access, connectors and optional services | Proposal with financing comparison; Help Center lists payback, NPV and IRR as proposal figures |
| SAM | Analysts and researchers | Free; email registration for a software key (sam.nlr.gov) | Free | NPV, LCOE and payback period calculated for several project types |
| Sunbase | Contractors who want CRM plus proposals | Plans start from $59 per user per month, customized by users, workflows and modules (sunbasedata.com) | Paid | Proposal lists savings, cash flow, payback period and ROI |
| SurgePV | Design, financial modeling and proposals in one web app | $1,899 per user per year (1 user); see /pricing | Paid; guided demo, no self-serve trial | Financial modeling is in the listed scope; payback and IRR outputs are not itemised |
Every price above was read on the vendor’s own page in October 2026. Taxes, discounts and plan limits change. Confirm them with the vendor before you buy.
Tool-by-Tool Comparison
The tools are listed alphabetically. This is not a ranking. Pick by the situation above.
Aurora Solar
Aurora Solar sells a residential design and sales platform. HelioScope, listed below, describes itself as an Aurora Inc. company.
Best for: residential sales teams that want financing, a bill comparison and an interactive proposal in the same tool as the design.
Not the right choice if: your main work is commercial tariff and storage economics. Energy Toolbase documents its focus there. Aurora’s pricing page describes Basic as the essentials for residential design and sales. The pricing and Sales Mode pages list “financial analysis” and “financing and energy bill comparisons” without naming outputs. But Aurora’s Help Center, read in Chrome, names payback period, net present value, IRR, LCOE and lifetime savings (Financial analysis: Overview). That article also says payback and IRR are less meaningful for zero-down loan deals. The pricing page describes its jurisdiction database as covering more than 25,000 US jurisdictions.
What the vendor documents: Sales Mode lists a utility rate database. In it you set your own rates or use rates from Genability and Aurora. It also lists adders, discounts and incentives. It lists integrated and custom financing with GoodLeap, Dividend, Mosaic and others, and financing and energy bill comparisons. It lists web and PDF proposals with activity tracking (pricing page, Sales Mode page).
Price (checked October 2026): Basic is $159 per user per month billed monthly or $135 per user per month billed annually ($1,620 billed annually). Premium is $259 per user per month billed monthly or $220 per user per month billed annually ($2,640 billed annually). Enterprise is custom. The page has a region selector. This is the North America view.
Limitations: Basic and Premium list 1 user and 50 projects per month. Whether a trial is offered is not stated on the pricing page.
Vendor link: aurorasolar.com.

Energy Toolbase
Energy Toolbase sells ETB Developer for modeling and proposals, plus ETB Controller, ETB Monitor and ETB Consulting.
Best for: commercial developers and EPCs (engineering, procurement and construction firms) whose result depends on time-of-use rates, demand charges and storage.
Not the right choice if: you want a published price. Energy Toolbase says the 30-minute demo call walks through “pricing for your team size”. The programs named on its Developer page (VNEM, NEMA) and its SGIP service are U.S. programs. Rate coverage outside the U.S. is not stated on the pages we read.
What the vendor documents: ETB Developer lists up-to-date utility rates, time-of-use modeling and modeling for NEM (net energy metering) programs. It also lists energy storage simulation, comparison of payment options and incentive calculations. Other items are branded proposals with open and click tracking, and user-selected degradation rates for solar and batteries. Its FAQ says the platform supports various financing structures. These include cash purchases, PPAs (power purchase agreements), loans and leases. The Developer page says users can import hourly or 15-minute usage. The rate count is given as 120,000+ on the home page and in the comparison table. It is given as “more than 110,000” in the FAQ (Developer page). It describes ETB Developer as a web-based platform.
Price (checked October 2026): not published for ETB Developer on the current pricing page. The pricing page offers a call. It says pricing for your team size is shared there. Implementation and support packages are listed on the same page. Its dollar figures are for ETB Controller and ETB Monitor, not ETB Developer. An ETB blog post dated May 2022 gave ETB Developer at $199 per user per month, or $179 per user per month billed annually. That figure is not on the current site. Ask for the current price.
Limitations: the pages we read do not name payback as an output. The home page shows example figures for bill savings, demand savings, return on investment, internal rate of return and 20-year net present value. It does not say which product produces each.
Vendor link: energytoolbase.com.

HelioScope
HelioScope is part of Aurora Inc.; its footer reads “an Aurora Inc. Company”.
Best for: commercial rooftop, carport and ground-mount designers who want IRR and LCOE visible while they change the design.
Not the right choice if: you need a homeowner sales flow. The pricing page describes the tools as being for commercial solar-plus-storage design, simulation and sales. Designs above 5 MW (DC) need Enterprise, per the same page.
What the vendor documents: the sales page lists a Utility Rate Editor. The pricing page places it on Pro and Enterprise, not Basic. The sales page also lists financial profiles that control the models a team uses, and customizable proposals. It says users can “see how each change affects IRR, LCOE, and other key metrics” (sales page). The pricing page lists financial modeling and sales proposals under Pro.
Price (checked October 2026): Basic is $159 per license per month or $1,620 per license per year, with 1 user and 10 projects per month. Pro is $259 per license per month or $2,640 per license per year. Enterprise is custom. The help center describes a standard 14-day free trial. It allows one trial per customer and has Pro-level features (HelioScope pricing).
Limitations: payback is not named on the sales page we read. Whether HelioScope offers lender financing options in the proposal is not stated there.
Vendor link: helioscope.aurorasolar.com.

OpenSolar
OpenSolar says its core app is free for solar professionals because partners pay to be on the platform.
Best for: small and new installers who want design, a branded proposal and a financing comparison in a core app the vendor describes as free.
Not the right choice if: you plan to connect OpenSolar to a CRM or accounting system. API Access (a link to other software) and connectors are charged from 16 April 2026. It is also not the right choice if you need premium imagery without a per-project fee. The product pages say “key financial figures” without naming them. The Help Center does name them (below).
What the vendor documents: the proposal page lists cash and monthly payment options and finance applications where available. It lists an interactive 3D view where you can “compare system options and key financial figures”. For electrification inputs, it lists Current vs. Electrified comparisons, monthly savings callouts and Now, Future, and Lifetime views (proposal page). The Sell page says customers can compare financing options within the proposal (Sell page). Its Help Center, read in Chrome, lists proposal “featured figures” (Featured Figures article). The figures are Payback, Discount Payback Period, Net Present Value, Total Return on Investment, Rate of Return on Investment (IRR) and Levelized Cost of Energy. It also says OpenSolar applies a utility rate from the project ZIP code. You can pick from its utility rate database or build a custom tariff with flat, time-of-use, tiered or demand-charge structures (tariff article).
Price (checked October 2026): the core app is described as free of charge. OpenSolar’s 16 February 2026 post says the core app stays free. From 16 April 2026, charges apply to API Access (a per-project fee) and to supported connectors (a flat monthly subscription). These charges are geo-specific, per its API page. Premium 2D and 3D imagery is “available on a pay-per-project basis with no ongoing subscription” (Sell page). OpenSolar explains the model on its Why Free page: partners including finance companies and distributors pay to be part of the platform.
Limitations: the Exclusive and Bespoke proposal templates are tied to two plans, per its Enterprise Services page. These are the Customize plan (US$1,350 per month) and Enterprise plan (custom price). Optional Support is US$500 per month.
Vendor link: opensolar.com.

SAM (System Advisor Model)
SAM is a free desktop application from the National Laboratory of the Rockies (NLR), the laboratory formerly called NREL.
Best for: analysts, consultants and researchers who want a transparent techno-economic model and can build the inputs themselves.
Not the right choice if: you need a customer-facing proposal, a browser tool or a design layout. SAM is a modeling application, not a sales tool.
What the vendor documents: for residential and commercial projects SAM calculates three results (financial models page). They are levelized cost of energy, the net present value of the after-tax cash flow, and a payback period. The same page describes an electricity bill calculator with net metering, net billing and buy-all-sell-all options. The SAM home page lists financial models for PPA, third-party ownership, community solar and merchant plants.
Price (checked October 2026): the home page calls SAM free. You register an email address to receive a free software key. It runs on Windows 11/10 (64-bit), macOS 12 or later and Linux, per the download page. The source code is open under a BSD-3 license, per the SAM Open Source page.
Limitations: the model is built for analysis and has no proposal output on the pages we read. Tariff and incentive data are inputs you provide or load.
Vendor link: sam.nlr.gov.

Sunbase
Sunbase sells contractor software for solar, roofing and construction teams.
Best for: solar contractors who want CRM, estimating, proposals and project management in one system and want savings and ROI in the proposal.
Not the right choice if: you want a stand-alone ROI calculator or design tool. Sunbase sets pricing by users, workflows and modules, with no fixed tiers.
What the vendor documents: the solar proposal page lists a “Savings, Cash Flow & ROI” section. It shows projected electricity savings, cash flow, payback and return on investment from the project’s financial assumptions. It also lists system cost, taxes, incentives, discounts, and cash and loan payment options. It lists shading and energy production results carried over from the approved design (solar proposal page).
Price (checked October 2026): “Plans start from $59 per user per month”, with the final cost set by team size, industry workflows and modules (Sunbase pricing).
Limitations: utility-rate sources and the calculation method for ROI are not described on the pages we read. The proposal page asks for a quote based on team size.
Vendor link: sunbasedata.com.

SurgePV
SurgePV is our product. SurgePV publishes this list and is one of the vendors on it.
Best for: installers and EPC teams that want financial modeling in the same web application as roof modeling, layout, shading analysis, yield modeling and proposals.
Not the right choice if:
- you need a self-serve trial. SurgePV offers a guided demo and does not advertise one.
- you need a published utility-rate database or demand-charge and storage dispatch modeling. Energy Toolbase documents these.
- you need payback, IRR or NPV outputs confirmed before you buy. SurgePV’s verified product scope lists financial modeling without itemising outputs, so ask for them in the demo.
- you need approval from a lender, authority or engineer. SurgePV outputs support design and documentation but do not replace that approval.
- you need a full CRM, monitoring or ERP (enterprise resource planning) product. SurgePV’s published product scope does not list a CRM. Monitoring and ERP are outside its scope.
What the vendor documents: a web application. It covers 3D roof modeling, solar array layout, shading analysis and energy-yield modeling. It also covers financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See the generation and financial tool and solar proposals.
Price (checked October 2026): $1,899 per user per year for one user, $1,499 per user per year for 3 seats, and $1,299 per user per year for 5 seats. This is per the pricing page. Access starts with a guided demo.
Limitations: results depend on the source data, assumptions and equipment models you use. Confirm pricing, access and contract terms in a written quote.
Vendor link: SurgePV pricing.
Sources and Dates
Vendor pages were read in October 2026, and prices are the figures each vendor published on those pages. The links below are the vendor pages the entries rely on, grouped by tool. SurgePV facts come from its own pricing and demo pages.
- Aurora Solar: Financial analysis: Overview, pricing page, Sales Mode page
- Energy Toolbase: FAQ, Developer page, pricing page, ETB blog post dated May 2022
- HelioScope: sales page, help center, HelioScope pricing, helioscope.aurorasolar.com
- OpenSolar: proposal page, Sell page, Featured Figures article, tariff article, 16 February 2026 post, API page, Why Free page, Enterprise Services page
- SAM (System Advisor Model): financial models page, SAM home page, download page, SAM Open Source page
- Sunbase: solar proposal page, Sunbase pricing
See SurgePV financial modeling on a project like yours
Book a guided demo and bring a quote you are working on.
Book a Free Demo
How Solar ROI Is Calculated
Simple payback is net system cost divided by annual savings. Every tool above starts there. The next table lists what else moves the answer, so you can check which of these a proposal includes.
| Input | Why it moves the result |
|---|---|
| System cost less incentives | Sets the net cost on the top line of the formula |
| Year-one bill savings | Depends on production and on the tariff, including time-of-use and demand charges |
| Tariff escalation | Raises savings each year and shortens payback |
| Panel degradation | Lowers production each year and lengthens payback |
| Financing | Changes cash flow even when total savings are the same |
| Tax treatment | Changes the net cost; check with a tax adviser |
Worked example (hypothetical)
These numbers are invented to show the arithmetic. They are not a quote or a market figure.
- Net cost: $24,000 system cost less a $2,000 rebate is $22,000.
- Year-one savings: $2,200.
- Simple payback: $22,000 ÷ $2,200 = 10.0 years.
- With 3% tariff escalation and 0.5% degradation, savings change by a factor of 1.03 × 0.995 = 1.02485 each year. Cumulative savings (the running total) pass $22,000 during year 10. That is a payback of about 9.0 years.
- Over 25 years the savings total about $75,000. The IRR is 11.2%. The net present value at a 6% discount rate is about $13,650.
The gap between 10.0 and 9.0 years comes only from the escalation and degradation assumptions. A proposal should print its assumptions so a buyer can check them.
U.S. incentive rules have changed
Do not rely on an older “30% through 2032” default. The IRS states that the Residential Clean Energy Credit covers property installed from 2022 through December 31, 2025. It is not available for property placed in service after that date. For commercial projects, IRS Notice 2025-42 says the clean electricity investment credit ends for applicable solar facilities placed in service after December 31, 2027. It says this applies to facilities whose construction begins after July 4, 2026. Check the current rule for your project and tax position with a tax adviser. A calculator that still applies an expired credit overstates returns.
Outside the U.S., incentives and tariffs follow local rules. For UK and Spanish markets, see our lists of the best solar software for UK installers and the best solar simulation tools in Spain.
Spreadsheet or Software
A spreadsheet gives you every assumption and no license cost. That suits a handful of quotes. Its weak points are manual. Tariffs and incentives do not update themselves. A wrong cell carries into every copy. The output is a static file.
Software earns its cost in two cases. You may quote so often that rebuilding those inputs takes more time than the subscription. Or your customers may expect an interactive proposal. SAM is a free middle route if you want a documented model rather than your own formulas.
Commercial and Residential ROI Differ
Residential results centre on bill savings, financing and the homeowner proposal. Commercial results turn on the tariff, including time-of-use rates and demand charges. They also turn on battery dispatch when storage is included. Energy Toolbase’s FAQ says its platform models demand charge reduction by simulating battery storage dispatch to lower peak demand. SAM has separate financial models for behind-the-meter projects, PPA projects and third-party ownership.
A commercial customer may be choosing between buying and a PPA or lease. Model both before you quote. See our guide to leasing versus buying solar and the glossary entries for payback period, net present value and levelized cost of energy.
Free Production Estimates Are Not ROI
PVWatts from the same laboratory estimates energy production from location, system size, tilt, losses and, in version 8, a bifacial option. Its results sections list solar radiation and AC energy, not payback or IRR. Use it to check the production figure a proposal assumes. Then run the money side in a tool above. Source: PVWatts Calculator.
How We Ordered These Tools
SurgePV publishes this page and is a vendor on this list. Its entry uses the same vendor-page sources and template as every other tool here.
The tools are listed alphabetically. The table records what each vendor documents, not what we saw in use. “Not stated” means the pages we read did not say. The feature may still exist.
| Tool | Payback, IRR or NPV outputs | Utility rates | Financing in proposal | Delivery | Price published |
|---|---|---|---|---|---|
| Aurora Solar | Payback period, NPV, IRR, LCOE, lifetime savings (Help Center); pricing page says “Financial analysis” | “Utility rate database: Custom and integrated” | “Integrated & custom financing” | Not stated | Yes, USD per user per month |
| Energy Toolbase | Project economics; home page shows example IRR, 20-year NPV and ROI; payback not named | 120,000+ rates (home page), “more than 110,000” (FAQ) | Compares payment options | Web-based | Not on the current pricing page; given on a call |
| HelioScope | IRR and LCOE (sales page) | Utility Rate Editor (Pro and Enterprise) | Not stated | Browser (WebGL, per help center) | Yes, USD per license |
| OpenSolar | Payback, discounted payback, NPV, ROI, IRR, LCOE (Help Center); product pages say “key financial figures” | Rate database by ZIP code, custom tariffs (Help Center) | Financing comparison in proposal | Tablet, phone, PC or Mac | Core app free; API Access and connectors charged; imagery per project |
| SAM | LCOE, NPV, payback period | Electricity bill calculator | PPA, third-party ownership and other models | Windows, Mac, Linux desktop | Free |
| Sunbase | Savings, cash flow, payback, ROI | Not stated | Cash, loan or other payment options | Not stated | From $59 per user per month |
| SurgePV | Financial modeling; outputs not itemised | Not stated | Not stated | Web application | Yes, USD per user per year |
Payback, IRR or NPV outputs. It matters because these are the figures a buyer or lender asks for. We did not check how any tool calculates them.
Utility rates. It matters because the tariff decides savings, most of all on commercial projects. We did not test the accuracy or currency of any rate database.
Financing in proposal. It matters because monthly payment changes how a buyer reads the same savings. We did not check lender approval flows.
Delivery. It matters if your team sells on a tablet or needs a desktop model. We did not test performance or offline use.
Price published. It matters because a published number lets you plan a budget. We left out add-ons, taxes and volume discounts.
SurgePV sits in the alphabetical list like the other six. The table shows where it differs. SurgePV documents financial modeling together with design and proposals, in a web application with a published price. Aurora Solar, Energy Toolbase, HelioScope, OpenSolar, SAM and Sunbase each document an output or data source that SurgePV’s verified scope does not itemise. So SurgePV is the best-for pick only for financial modeling inside a design-to-proposal workflow.
Frequently Asked Questions About Solar ROI Calculators
What is the best solar ROI calculator software?
It depends on the project. Energy Toolbase documents a utility-rate database and demand-charge modeling for commercial and storage projects. Aurora Solar builds financing and bill comparison into residential proposals. SAM from the National Laboratory of the Rockies is free and calculates NPV, LCOE and payback. Match the tool to your project type using the comparison table.
How do you calculate the payback period of a solar system?
Simple payback is the net system cost divided by the annual savings. Take a hypothetical $22,000 net cost with $2,200 of first-year savings. Simple payback is 10.0 years. If savings grow 3% a year for tariff escalation and fall 0.5% a year for panel degradation, the same system pays back in about 9.0 years. Tools differ in whether they use the simple or the escalated version. Check which one a proposal shows.
What is the difference between IRR and payback period in solar?
Payback is the number of years until cumulative savings equal the net cost. IRR is the annual return rate that makes the present value of all future savings equal the net cost. So it counts when cash flows arrive over the system life. In the hypothetical example on this page, payback is about 9.0 years and the 25-year IRR is 11.2%.
Can solar ROI calculators model federal tax credits?
Some list incentives as an input. For example, Aurora Solar’s proposals list “Adders, discounts, and incentives”. The rules have changed. The IRS states the Residential Clean Energy Credit is not available for property placed in service after December 31, 2025. IRS Notice 2025-42 sets a December 31, 2027 placed-in-service cutoff for solar facilities that begin construction after July 4, 2026. Check the rule with a tax adviser before you rely on any tool’s default.
Is there a free solar ROI calculator?
Yes, two on this list. SAM is a free desktop application that calculates levelized cost of energy, net present value and payback period. OpenSolar says its core app is free of charge to solar professionals. But charges apply from 16 April 2026 to API Access and connectors. PVWatts estimates energy production. The results sections we read list solar radiation and AC energy, not payback or a return on investment.
How do commercial solar ROI calculators differ from residential ones?
Commercial results depend on the utility tariff, including time-of-use rates and demand charges. They also depend on storage dispatch when a battery is included. Energy Toolbase documents both. Residential tools centre on bill savings, financing options and the customer proposal, as Aurora Solar and OpenSolar do.
Related lists
For related comparisons, see best solar financing software, best solar quoting software, best solar proposal software and best solar roof design software. For the product behind the SurgePV entry, see generation and financial tool.


