Manchester

Wondrwall Group

Wondrwall Group blends home automation, energy intelligence and clean tech to create homes that manage energy, reduce bills & cut carbon footprints.
★★★★★  
4
👥
18
Reviews
🏆Elite+ Installer

About

Wondrwall Group is a UK-based technology and renewable energy company that integrates solar PV, battery storage, and smart home automation into a single intelligent platform. With a vision to transform the way people consume energy, Wondrwall empowers households to become self-sufficient, reduce energy costs, and minimize their carbon footprints through cutting-edge innovation.

Founded on the principle of making homes “intelligent by design,” Wondrwall combines renewable energy generation with advanced artificial intelligence to optimize energy use. Their mission is to help create a sustainable future by offering customers greater control, efficiency, and independence over their energy consumption.

The company provides end-to-end solutions including consultation, system design, installation, and ongoing support. With years of innovation and thousands of systems installed across the UK and internationally, Wondrwall Group has become a leader in smart renewable energy solutions, setting new benchmarks in the sector.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Battery storage integration

✔️ Smart home automation systems

✔️ EV charging station installations

✔️ Commercial renewable energy solutions

✔️ Solar servicing and maintenance

✔️ Energy audits and consultancy

Products & Manufacturers

Wondrwall Group develops and integrates its own proprietary smart energy technology while also partnering with trusted manufacturers:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, Wondrwall AI-driven storage, LG Chem
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Tower 12, 18-22 Bridge St, Manchester M3 3BZ, United Kingdom
44 161 533 0150
hello@wondrwall.co.uk

Service Areas

Manchester

Certifications

Wondrwall Group operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar and battery installations.
  • NICEIC – electrical safety and compliance.
  • RECC (Renewable Energy Consumer Code) – consumer protection and ethical standards.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Wondrwall Group provides comprehensive warranty coverage to ensure long-term system performance:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Battery storage systems – 5–10 years depending on brand.
  • Workmanship/installation – 5–10 years.
  • Smart home hardware/software – covered by manufacturer warranties and updates.

Company Details

Languages Spoken

English (with multilingual support for international customers)

Years in Business

Over a decade of expertise in renewable energy and smart home innovation

Projects Completed

Thousands of renewable and smart energy systems installed across the UK and globally

Customer Reviews

Read what our customers have to say about their experience with Wondrwall Group Solar Solutions

Every time I contact Wondrwall their service is out of this world. They respond quickly professionally and do as much as I can to help. Any issues I’ve ever had have been rectified instantly. I cannot recommend their system and service enough.

Joe Wallington (SailwithJoe)

I moved into property with Wondrwall and couldn't get the system to connect to my wifi. The previous owner of the property advised me to contact customer services. I didn't really hold out much hope but tried the number anyway. I spoke to Ali who was very helpful and offered to stay on the line and talk me through it all. Instead I opted to work through the instructions myself. As i was doing this, Ali called me back to say their representative was in the area and could call in to help.

Helen Haslam-Mousawi

Support team at Wondrwall got involved with an issue we had with our water tank. They didn’t have to as the problem was with Mixergy. There support in this matter helped us to resolve the problem.

Philip Whitehouse

Frequently Asked Questions

What does Wondrwall Group specialize in?

Wondrwall claims to focus on smart home, solar and integrated energy management systems (from their site).

Is Wondrwall a legitimate solar installer?

As of now, public information is limited; check their company registration, references, and past projects before proceeding.

What types of solar panels does Wondrwall use?

They likely use quality photovoltaic panels consistent with modern system design; ask them for product datasheets and brand names when getting a quote.

Get a Free Solar Quote

Interested in Wondrwall Group? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.