Manchester

Voltedge Greentech

Voltedge Greentech, founded in April 2025, provides solar panel installations, battery systems, EV charger distribution & heat pump solutions in Greater Manchester.
★★★★★  
5
👥
1
Reviews
🏆Elite+ Installer

About

Voltedge Greentech is a UK-based renewable energy solutions provider specializing in solar PV systems, battery storage, and EV charging technologies. With a strong focus on sustainability and innovation, the company designs and installs bespoke renewable systems that help households, businesses, and communities reduce energy bills, achieve energy independence, and contribute to a cleaner environment.

The mission of Voltedge Greentech is to deliver high-quality, future-proof renewable energy solutions that combine cutting-edge technology with exceptional customer service. Their vision is to empower customers to embrace clean energy and play a key role in the UK’s transition to a net zero future.

With a dedicated team of experienced engineers and renewable specialists, Voltedge Greentech offers end-to-end services—from consultation and design to installation and ongoing aftercare. Known for their transparent approach and professionalism, the company ensures that every project is tailored to meet client needs while delivering maximum efficiency and long-term value.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar PV systems

✔️ Battery storage solutions

✔️ EV charging station installations

✔️ Solar system maintenance and servicing

✔️ Energy efficiency audits and consultation

✔️ Financing and renewable support options

Products & Manufacturers

Voltedge Greentech partners with leading renewable manufacturers to ensure efficiency and durability:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, Sonnen, LG Chem, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Jactin house, 24 Hood St, Ancoats, Manchester M4 6WX, United Kingdom
44 7591 986095
enquiry@voltedge-greentech.co.uk

Service Areas

Manchester

Certifications

Voltedge Greentech operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – compliance with electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – consumer protection and fair trading.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Voltedge Greentech provides warranties consistent with UK industry standards:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Several years of operation in the UK renewable energy sector

Projects Completed

Dozens of residential and commercial installations successfully delivered

Customer Reviews

Read what our customers have to say about their experience with Voltedge Greentech Solar Solutions

I didn’t know much about solar panels before, but the consultation was really thorough and easy to follow. They explained how the system would work for my home, broke down the costs clearly, and answered all of my questions without rushing me. I came away with a much better understanding and feel confident about making the switch to solar. Highly recommend them if you’re considering panels but aren’t sure where to start.

Hannah Whitmore

Frequently Asked Questions

What areas does Voltedge Greentech serve?

Voltedge Greentech serves Greater Manchester and surrounding areas.

Does Voltedge Greentech offer free quotes or consultations?

Yes — their website advertises a free consultation / free renewable energy quote.

What warranties does Voltedge Greentech provide on panels and installation?

They mention a 25-year performance warranty (for the system) and MCS-certified installation.

Get a Free Solar Quote

Interested in Voltedge Greentech? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.