Cardiff

Vedmore Electrical Solutions

Vedmore Electrical Solutions, incorporated in 2024, offers domestic & commercial electrical, solar PV, battery and EV charge point installations in Cardiff and South Wales.
★★★★★  
5
👥
36
Reviews
🏆Elite+ Installer

About

Vedmore Electrical Solutions is a UK-based electrical and renewable energy specialist providing high-quality solar PV installations, battery storage, and EV charging solutions for homes and businesses. With a foundation in electrical engineering excellence, the company combines technical expertise with a strong commitment to customer care, ensuring reliable and efficient energy solutions tailored to client needs.

The mission of Vedmore Electrical Solutions is to deliver sustainable, cost-effective energy systems that empower households and organizations to reduce energy bills, achieve energy independence, and lower their carbon footprints. Their vision is to play an active role in the UK’s transition to a cleaner energy future by integrating modern renewable technologies into everyday living and working spaces.

Known for professionalism, safety, and transparency, Vedmore Electrical Solutions offers complete end-to-end services, from consultation and design to installation and ongoing maintenance. With years of experience in both electrical contracting and renewable energy, the company has built a reputation as a dependable partner for sustainable power solutions across the UK.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar systems

✔️ Battery storage integration

✔️ EV charging point installations

✔️ Electrical contracting and compliance services

✔️ Solar maintenance and aftercare

✔️ Energy efficiency consultation

Products & Manufacturers

Vedmore Electrical Solutions partners with trusted renewable energy manufacturers to ensure long-term performance and reliability:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

48 Clos Rhys Meurug, Cardiff CF5 6GA, United Kingdom
44 7825 954700
electric@vedmore.com

Service Areas

Cardiff

Certifications

Vedmore Electrical Solutions operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV systems.
  • NICEIC – ensuring electrical safety compliance.
  • RECC (Renewable Energy Consumer Code) – consumer rights and fair trading.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Vedmore Electrical Solutions offers warranty coverage aligned with industry standards:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on product.

Company Details

Languages Spoken

English

Years in Business

Several years of professional experience in electrical and renewable energy services

Projects Completed

Dozens of residential and commercial projects successfully delivered across the UK

Customer Reviews

Read what our customers have to say about their experience with Vedmore Electrical Solutions Solar Solutions

I contacted Lee last week to enquire whether he could fit some spotlights and new light switches. He got back to me and we arranged for him.to visit and give us a quote. He completed the work the same week to a high standard and at a competitive price. Lee has also done some work for my daughter in the past and we are both very happy with his professional, swift service.

Bob Leeves

We needed a home EV charger installed, from the start we had great communication. Lee knew his stuff and was able to advise on the type of charger and additional information as this was our first EV car. I would highly recommend

Gareth Burford

Lee and Vedmore were recommended to me as approved installers for GivEnergy solar / battery kit. Having had a bad experience with a national supplier I was looking for a reliable, approachable and local option.

Steve Kirtley

Frequently Asked Questions

What certifications should Vedmore Electrical hold?

They should ideally hold MCS (Microgeneration Certification Scheme) certification, be a member of RECC, and be of a registered electrician body (such as NICEIC) — check their credentials.

How long does Vedmore Electrical take to install a solar system?

(No public data) — for a typical domestic system, 1-3 days is common; complex projects may take longer.

What happens if the solar panels stop working under Vedmore’s system?

Usually there is a warranty for the panels and workmanship; Vedmore should provide support or repair service under warranty or maintenance agreement.

Get a Free Solar Quote

Interested in Vedmore Electrical Solutions? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.