Cardiff

Urban Solar Ltd

Urban Solar Ltd works in metropolitan settings, delivering rooftop PV, solar integration and urban renewable solutions tailored for dense environments.
★★★★★  
5
👥
5
Reviews
🏆Elite+ Installer

About

Urban Solar Ltd is a UK-based renewable energy company dedicated to delivering solar PV, battery storage, and sustainable energy solutions for households, businesses, and communities. With a focus on innovation, affordability, and sustainability, the company provides tailored energy systems designed to reduce electricity costs, lower carbon emissions, and support the UK’s clean energy transition.

The mission of Urban Solar Ltd is to make solar energy accessible and practical for everyone, from individual homeowners to larger organizations. Their vision is to contribute to a greener, more sustainable future by helping communities adopt renewable technologies that deliver long-term efficiency and reliability.

With a skilled team of solar specialists and engineers, Urban Solar Ltd offers end-to-end services including consultation, design, installation, and aftercare. Known for professionalism, customer care, and technical expertise, the company has established itself as a trusted provider of solar solutions in urban and rural areas alike.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging station installation

✔️ Solar panel maintenance and servicing

✔️ Energy audits and consultancy

✔️ Financing and renewable support options

Products & Manufacturers

Urban Solar Ltd partners with trusted renewable brands to deliver reliable and efficient energy systems:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Unit 5 (on right), Heron Road, Cardiff CF3 3JE
44 345 265 8315
support@sitename.com

Service Areas

Cardiff

Certifications

Urban Solar Ltd operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – ensuring consumer protection and ethical trading.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Urban Solar Ltd provides warranties in line with UK solar industry practices:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Several years of renewable energy expertise in the UK

Projects Completed

Dozens of residential and commercial installations successfully delivered

Customer Reviews

Read what our customers have to say about their experience with Urban Solar Ltd Solar Solutions

Urban Solar have recently installed solar panels for me, and they've been excellent. It was clear instantly that they were engineers who knew their stuff, and would listen and work with us to get what we wanted. The quote included everything, and was extremely comprehensive in detail, including a break down of costs.

Pete Obee

Urban Solar did an amazing job installing solar panels and battery backup in our home. They were very professional, friendly and clearly experts all aspects of solar energy. They explained everything clearly and went above and beyond in ensuring that the installation was as tidy and functional as possible. Would highly recommend Urban Solar!

Matthew Rollings

I’m a techy person with lots of difficult questions. I did my research, spoke to 5 companies and had 4 come to visit us. Patrick, the director at Urban Solar, answered every questions I had with what was clearly expert knowledge. He also took the time to understand what was important to us about the system (in our case, getting high yield reliable panels was important, and we didn’t want to pay a premium for aesthetics). He came across as a solar expert rather than a salesperson, answered all of my questions and, as it happens also provided the cheapest quote.

Neil Cottrell

Frequently Asked Questions

Does Urban Solar offer battery storage or EV charging services?

(No clear public info) — many modern solar firms do; you should check their service pages or contact them.

What warranties does Urban Solar provide on panels and installation?

(Not publicly stated) — expect standard manufacturer warranties (10–25 years) plus installer workmanship warranty (5–10 years) — confirm with the company.

How much can I save with solar via Urban Solar?

Savings depend on your electricity usage, roof condition, and local rates — Urban Solar would likely provide an estimated ROI or payback period during quoting.

Get a Free Solar Quote

Interested in Urban Solar Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.