.png)
UPS Solar is a UK-based renewable energy company dedicated to delivering high-quality solar PV installations, battery storage solutions, and EV charging systems for both residential and commercial clients. With a strong reputation for professionalism, transparency, and technical expertise, the company helps customers cut energy costs, reduce carbon emissions, and gain energy independence through sustainable technologies.
The mission of UPS Solar is to make solar power simple, affordable, and accessible for households and businesses across the UK. Their vision is to support the country’s journey toward a low-carbon future by promoting renewable energy adoption at every level. Known for their excellent customer care and commitment to delivering long-term value, UPS Solar has become a trusted name in the renewable energy sector.
Providing end-to-end services—from consultation and system design to installation and aftercare—UPS Solar ensures that every project is delivered with efficiency, precision, and reliability. With a skilled team of experts and a customer-first approach, the company continues to empower communities to embrace clean energy.
UPS Solar partners with globally trusted renewable energy manufacturers to ensure efficiency and reliability:



UPS Solar operates with or in line with the following certifications:
UPS Solar provides warranties consistent with UK solar industry practices:
English
Several years of professional experience in renewable energy installations
Dozens of residential and commercial solar projects completed successfully across the UK
I had been shopping around for a while for Solar and eventually landed on UPS due to the volume of positive reviews and price offered.
The whole process was incredibly smooth - from registration and quotation to installation and follow-up. Their pricing is very competitive, and they take care of everything, including DNO submission, MCS certification, and paperwork for SEG.
Exceptional customer service and install. A few broken slates revealed under the scaffolding planks when the scaffolding company removed the scaffolding the next week. UPS took full responsibility and very promptly rectified. Weve been really impressed.
UPS Solar is listed in installer directories (e.g., Voltwise) as a solar installer. Voltwise However, I could not find detailed public info on specific system types (PV, battery, hybrid) — contact them for their offerings.
Appears in recognized installer listings (Voltwise). Voltwise Still, you should check their company registration, certifications, customer reviews, and insurance before contracting.
Public directories list them among UK solar installers. However, their exact regional coverage is not clearly posted; you should confirm directly with the company.