Manchester

TJS Solar

TJS Solar installs solar panels, inverters and support systems for residential and commercial clients, promoting cost savings and sustainability.
★★★★★  
5
👥
19
Reviews
🏆Elite+ Installer

About

TJS Solar is a UK-based renewable energy company focused on providing high-quality solar PV installations, battery storage, and EV charging solutions for residential and commercial clients. With a reputation for professionalism, reliability, and excellent customer service, the company helps households and businesses reduce energy costs, cut carbon emissions, and achieve energy independence.

The mission of TJS Solar is to make renewable energy simple, accessible, and affordable for all, while delivering systems that perform efficiently for decades. Their vision is to support the UK’s net zero targets by empowering communities to transition toward clean energy through advanced technologies and bespoke solutions.

With a skilled team of engineers and renewable energy specialists, TJS Solar delivers complete end-to-end services, from consultation and system design to installation and aftercare. Known for technical precision, transparent pricing, and long-term customer support, the company has become a trusted name in the UK renewable sector.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar energy systems

✔️ Battery storage integration

✔️ EV charging point installations

✔️ Solar panel maintenance and repairs

✔️ Energy consultation and audits

✔️ Financing and renewable support

Products & Manufacturers

TJS Solar partners with leading renewable energy manufacturers to ensure efficiency and long-term reliability:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Office 3, Unit 4, 16 Brown St N, Leigh WN7 1BU, United Kingdom
44 1942 92645
info@tjssolar.co.uk

Service Areas

Manchester

Certifications

TJS Solar operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – consumer protection and fair practices.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

TJS Solar offers warranties aligned with UK solar industry best practices:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.

Company Details

Languages Spoken

English

Years in Business

Several years of expertise in renewable energy installations

Projects Completed

Dozens of residential and commercial projects successfully delivered across the UK

Customer Reviews

Read what our customers have to say about their experience with TJS Solar Solar Solutions

We recently had solar panels and storage fitted by Tony and his team at TJS Solar. From start to finish the process was easy and well explained by Gary who did the quote to Tony who was always available to answer questions.

Paul Willard

Frequently Asked Questions

Is TJS Solar currently active and legitimate?

Public information about TJS Solar is limited. Their domain exists but no robust details (e.g. registration status, portfolio) were found in preliminary searches. You should verify via Companies House or local directories.

What types of service does TJS Solar offer (e.g. residential, commercial)?

No definitive public data was located. You should ask them whether they cover both domestic and commercial solar PV, battery, EV integration, and maintenance.

What warranties or support are included?

Since no explicit warranty info is available publicly, you must ask them directly for panel manufacturer warranty, installation warranty, monitoring, and after-sales support.

Get a Free Solar Quote

Interested in TJS Solar? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.