Cardiff

The Solar House

The Solar House specializes in residential solar power, battery storage and energy services that maximize solar yield and reduce electricity costs.
★★★★★  
5
👥
30
Reviews
🏆Elite+ Installer

About

The Solar House is a UK-based renewable energy specialist providing high-quality solar PV systems, battery storage solutions, and sustainable technologies for residential and commercial clients. With a strong focus on design innovation and customer satisfaction, the company delivers bespoke solar installations that help customers save on energy bills, reduce carbon emissions, and enjoy greater energy independence.

The mission of The Solar House is to make renewable energy both stylish and practical, integrating advanced solar technologies into modern living spaces. Their vision is to redefine how homes and businesses generate and use energy, supporting the UK’s net zero goals while offering systems that combine efficiency with long-term value.

With a dedicated team of solar professionals, The Solar House provides end-to-end services—from consultation and system design to installation and maintenance. Known for its professionalism, transparent pricing, and commitment to quality, the company has become a trusted name in the renewable energy sector.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar energy systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Solar servicing and maintenance

✔️ Bespoke solar design for modern homes

✔️ Energy consultation and audits

Products & Manufacturers

The Solar House partners with globally recognized renewable manufacturers to ensure efficiency and performance:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, Sonnen, LG Chem, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Whitchurch, Cardiff, United Kingdom
44 1242 502010
team@thesolarhouse.co.uk

Service Areas

Cardiff

Certifications

The Solar House operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV systems.
  • NICEIC – ensuring compliance with electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – consumer protection and fair trading.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

The Solar House provides warranties consistent with UK solar industry standards:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.

Company Details

Languages Spoken

English

Years in Business

Several years of renewable energy and solar design expertise

Projects Completed

Dozens of bespoke residential and commercial solar projects across the UK

Customer Reviews

Read what our customers have to say about their experience with The Solar House Solar Solutions

Solar installation went as smoothly as I could have hoped for. They were responsive and helpful from the get to, and kept me in the loop at every step. They weren't pushy about making the sale and took onboard all of my requirements to get the right set up for me.

Chloe

I can't rate the team at Solar House highly enough. Wayne and Dan were both helpful and knowledgeable without any hard sell or pressure involved. A visit to their showroom in Cardiff also proved useful to talk through and better understand the solar options for our property before committing.

Jon Goldsworthy

Dan came out and advised and quoted our system, he was very professional in his approach so this sold it to me. The installation was all very smooth, workers were spotlessly clean and very attentive in their work.The aftercare and communication from Katie has been great to. All in all an excellent experience with the Solar house. Id certainly reccomend to all friends and family

Owen Staphnill

Frequently Asked Questions

How long has The Solar House been in business?

(No clear public records found) — check Companies House or their “About us” page for founding year.

Does The Solar House offer free quotes or consultations?

Most solar businesses offer a free site survey or no-obligation quote; likely so — verify with The Solar House.

What financing options does The Solar House provide?

(Not publicly listed) — They may partner with third-party finance companies; ask them directly.

Get a Free Solar Quote

Interested in The Solar House? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.