London

Synergy Power Ltd

Synergy Power Ltd installs bespoke solar PV, EV charging, and battery storage solutions for commercial and residential clients across England, focusing on sustainability.
★★★★★  
5
👥
100
Reviews
🏆Elite+ Installer

About

Synergy Power Ltd is a UK-based renewable energy company specializing in solar PV systems, battery storage, and energy efficiency solutions for residential, commercial, and public sector clients. With a strong reputation for quality and reliability, the company delivers bespoke renewable systems designed to reduce energy costs, cut carbon emissions, and provide long-term energy independence.

The mission of Synergy Power Ltd is to help households and businesses transition to sustainable energy through practical, affordable, and innovative solutions. Their vision is to be a trusted partner in the UK’s clean energy transition, empowering communities to embrace renewable technologies that support a net zero future.

With a professional team of engineers and energy specialists, the company provides complete end-to-end services, from consultation and system design to installation, testing, and ongoing aftercare. Known for its customer-first approach and technical expertise, Synergy Power Ltd has become a dependable name in the UK renewable energy market.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar PV systems

✔️ Battery storage solutions

✔️ EV charging station installations

✔️ Solar maintenance and repairs

✔️ Energy efficiency audits and consultancy

✔️ Financing and renewable support options

Products & Manufacturers

Synergy Power Ltd partners with leading global renewable manufacturers to ensure system reliability and performance:

  • Solar Panels: Trina Solar, Q CELLS, JA Solar, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Friars House, Manor House Dr, Coventry CV1 2TE, United Kingdom
442477752410
info@synergypowerltd.co.uk

Service Areas

London

Certifications

Synergy Power Ltd operates with or in line with recognized UK industry standards and certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV systems.
  • NICEIC – compliance with UK electrical safety regulations.
  • RECC (Renewable Energy Consumer Code) – consumer protection and ethical business practices
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Synergy Power Ltd provides warranties aligned with UK solar industry best practices:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Several years of renewable energy expertise in the UK

Projects Completed

Dozens of residential and commercial renewable projects successfully delivered

Customer Reviews

Read what our customers have to say about their experience with Synergy Power Ltd Solar Solutions

We recently had solar panels and a Powerwall 3 battery installed by Synergy Power Ltd, and we couldn't be happier with the entire experience. Their efficiency truly impressed us; the process from initial contact to the start of installation was incredibly quick, with work commencing in a very short time frame.

Adam Perry

After contacting and receiving quotes from a number of companies. I got in touch with Kuki Dattani @ synergy. He gave a very competitive quote and came round and did a physical site survey. I decided to go with Synergy as they were the most professional and I liked the fact that they use all their own installers and don’t use any 3rd party contractors. I had 6 kw system with a Solaredge Inverter + Jinko panels + Tesla Powerwall 2. When the install came around, scaffolding went up with no hastle . The day of the install all went with a breeze and no complications. Everything about the installation was top drawer. If you want a professional install that is top quality then look no further than Synergy. Very highly recommended.

Karun Jaswal

Used this company for solar and battery installation, they also replaced my ageing consumer unit. Absolutely great experience with this business from beginning to end. My experience was looked after by Roger in the office who may I add was one of the main reasons I decided to use this company. There were a few issues as the instal progressed but these were dealt with promptly and effectively. Every member of staff i interacted with were knowledgeable and professional and to put icing on the cake were actually really nice friendly fellas.

Mick Moore

Frequently Asked Questions

How long has Synergy Power Ltd been in business?

Synergy Power Ltd has years of experience delivering solar PV and renewable energy solutions across the UK.

Does Synergy Power Ltd offer free quotes or consultations?

Yes, they provide free consultations to help customers understand solar costs and benefits.

What maintenance services are included?

They provide system monitoring, servicing, and aftercare support to ensure long-term solar performance.

Get a Free Solar Quote

Interested in Synergy Power Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.