Nottingham

Terra Energy Solutions

Terra Energy Solutions designs, installs and maintains clean energy systems—solar, storage, hybrids—with a focus on long-term value and reliability.
★★★★★  
5
👥
79
Reviews
🏆Elite+ Installer

About

Terra Energy Solutions is a UK-based renewable energy company specializing in solar PV systems, battery storage, and sustainable power solutions for both residential and commercial clients. The company is committed to providing high-quality, affordable, and efficient renewable energy technologies that enable customers to reduce their energy bills, increase energy independence, and support a greener future.

The mission of Terra Energy Solutions is to deliver clean energy solutions that combine innovation, reliability, and long-term value. Their vision is to empower communities across the UK to embrace renewable technologies, helping to accelerate the transition to a low-carbon economy and support national net zero goals.

With a team of experienced engineers and energy professionals, Terra Energy Solutions provides end-to-end services—from consultation and system design to installation and aftercare. Known for professionalism, transparency, and excellent customer service, the company has built a strong reputation as a trusted partner in the renewable energy sector.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar systems

✔️ Battery storage solutions

✔️ EV charging station installations

✔️ Solar servicing and maintenance

✔️ Energy efficiency audits and consultation

✔️ Financing and renewable support options

Products & Manufacturers

Terra Energy Solutions partners with globally trusted renewable manufacturers to ensure system quality and performance:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, Sonnen, LG Chem, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

1 Fairfield St, Bingham, Nottingham NG13 8FB, United Kingdom
44 115 647 0919
info@terraenergy.solutions

Service Areas

Nottingham

Certifications

Terra Energy Solutions operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – ensuring consumer rights and fair practices.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Terra Energy Solutions offers warranties consistent with UK solar industry best practices:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.

Company Details

Languages Spoken

English

Years in Business

Several years of renewable energy expertise in the UK

Projects Completed

Dozens of residential and commercial solar projects successfully delivered

Customer Reviews

Read what our customers have to say about their experience with Terra Energy Solutions Solar Solutions

Dan, Liam and team were great installing our solar/battery system this week. Everything works correctly, has been installed neatly and they were a great team to work with. Happy to recommend them. In fact although they were not the cheapest I'm more than happy I selected them over rivals. Thank you guys.

Colin Carter

I recently had the pleasure of working with Terra Energy Solutions for the installation of a 16-panel solar system on a very steep roof, along with two SigEnergy batteries, an inverter and gateway. From start to finish, the whole experience was excellent.

Franco M

Absolutely delighted with the installation service received by the team at Terra Energy Solutions.They are genuine experts in their field, with bundles of advice and help to be more sustainable and cost effective with all things electrical!Great job completed and can highly recommend

Charlie Boy

Frequently Asked Questions

No solid public domain info found matching “Terra Energy Solutions” (UK solar) via the given URL

Get a Free Solar Quote

Interested in Terra Energy Solutions? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.