Nottingham

Tekidan Ltd

Tekidan Ltd specializes in renewable energy systems, integrating solar, storage & control solutions to enable smarter, cleaner energy adoption.
★★★★★  
5
👥
20
Reviews
🏆Elite+ Installer

About

Tekidan Ltd is a UK-based renewable energy and electrical services company specializing in solar PV installations, battery storage systems, and sustainable energy technologies. With a reputation for professionalism and quality, Tekidan Ltd provides bespoke renewable energy solutions designed to help homes and businesses cut energy costs, reduce carbon emissions, and achieve energy independence.

The mission of Tekidan Ltd is to deliver reliable, affordable, and innovative energy systems that make clean energy accessible for everyone. Their vision is to support the UK’s transition toward a low-carbon future by empowering communities and businesses to embrace renewable technologies that are efficient, safe, and future-ready.

With years of expertise in both electrical and renewable energy services, Tekidan Ltd offers end-to-end solutions—from consultation and system design to professional installation and long-term maintenance. Known for its customer-focused approach and technical know-how, the company continues to expand its footprint as a trusted provider in the renewable sector.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Full electrical contracting services

✔️ Solar maintenance and servicing

✔️ Energy audits and consultation

Products & Manufacturers

Tekidan Ltd partners with trusted renewable manufacturers to ensure high-quality system performance:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

11 High St, Ruddington, Nottingham NG11 6DT, United Kingdom
44 115 648 1674
hello@tekidan.co.uk

Service Areas

Nottingham

Certifications

Tekidan Ltd operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV systems.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – ensuring consumer protection.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Tekidan Ltd offers warranties aligned with UK solar industry best practices:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.

Company Details

Languages Spoken

English

Years in Business

Several years of experience in electrical and renewable energy installations

Projects Completed

Dozens of residential and commercial solar projects across the UK

Customer Reviews

Read what our customers have to say about their experience with Tekidan Ltd Solar Solutions

Dan really is a superstar. Having had major troubles with previous solar companies I was a bit hesitant and wary. I needn't have been. Dan and his guys left the place cleaner than they found it which is a great indicator of their work. I have a large off grid system, (solar and battery), powering my business and the original installers where ghosting me and the experts they had subcontracted to had gone bust, I felt completely at a loss. Dan has stripped my system down, simplified it, completely rewired it and installed an EV charger at the same time. He advised me on how to get the most from the kit I have including advice on Energy Tariff's. He is in the process of setting up the automation to ensure its a system that just works in the background and that I don't have to constantly monitor and worry about.

Alex Leiserach

If you want the best in solar installation and batteries look no further. This man is the best at solar installation, batteries and complete systems. You will not find a more knowledgable man that will design a system to meet your requirements.If I ever have any queries or questions about my system Dan is always at the end of the phone with great advice and patience and helps with any configuration issues that arise, even two years after installation. He even assists me to make the right decisions about which energy tariff to sign up to which has saved me a lot of money as well.

ian knight

Danny installed our Pod-Point EV car charger. Superb workmanship, neat and tidy and everything works really well. We are delighted. Very friendly and super responsive with both the quote and work. We were going to go with the dealership recommended firm but we changed our minds as it was taking far too long to sort everything out. Literally months. So glad we did as Danny sorted out everything within 2 weeks of approach. Just brilliant. Highly recommended

Chris Ball

Frequently Asked Questions

What types of solar systems does Tekidan install?

They design, supply, and integrate solar & battery systems (including Victron energy systems) for existing and new setups.

How experienced is Tekidan in renewables?

They have over 20 years of experience in installing solar panels and renewable energy systems.

Does Tekidan offer battery-only solutions?

Yes — they handle battery systems upgrades or installations even without a solar installation.

Get a Free Solar Quote

Interested in Tekidan Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.