Birmingham

Techfix Electric Ltd

Techfix Electric Ltd provides advanced electrical and renewable solutions, combining solar, EV charging and power system services.
★★★★★  
5
👥
94
Reviews
🏆Elite+ Installer

About

Techfix Electric Ltd is a UK-based electrical and renewable energy solutions provider, specializing in solar PV installations, battery storage, and EV charging systems. With a strong background in electrical contracting, the company brings technical expertise and attention to detail to every project, ensuring safe, reliable, and efficient renewable energy systems for residential and commercial clients.

The mission of Techfix Electric Ltd is to combine high-quality electrical services with modern renewable technologies to help households and businesses reduce energy bills, achieve energy independence, and contribute to a sustainable future. Their vision is to be a trusted partner in the UK’s clean energy transition by delivering innovative, practical, and future-proof solutions.

By offering end-to-end services, from consultation and system design through to installation and maintenance, Techfix Electric Ltd provides clients with seamless and professional renewable energy solutions. With years of expertise and a reputation for reliability, the company has established itself as a dependable choice for both electrical and renewable energy services.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Full electrical contracting services

✔️ Solar system servicing and maintenance

✔️ Energy efficiency consultation

Products & Manufacturers

Techfix Electric Ltd partners with globally trusted manufacturers to deliver reliable and efficient systems:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Unit 037, 1 Rocky Ln, Birmingham B6 5RQ, United Kingdom
44 121 769 0599
info@techfixelectric.co.uk

Service Areas

Birmingham

Certifications

Techfix Electric Ltd operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV systems.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – consumer protection and fair trading.
  • ISO 9001/14001 – quality and environmental management standards.

Warranty Information

Techfix Electric Ltd provides warranty coverage in line with UK solar industry practices:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.

Company Details

Languages Spoken

English

Years in Business

Several years of experience in electrical and renewable energy services

Projects Completed

Dozens of residential and commercial projects successfully delivered across the UK

Customer Reviews

Read what our customers have to say about their experience with Techfix Electric Ltd Solar Solutions

Utterly superb. Nicholas and his team were tasked with helping us transform our outdoor space at home by providing electrics to our cabin and gazebo. Right from the outset Nicholas was the absolute best; really friendly and professional, with an extremely clear and reasonable quote, great communication and he even helped us to make choices about what lights, cables and junction boxes to pick to get the look of our space right. When it came to working on site;

James Reader

Excellent service! They did a great job with the electrical repairs and replaced the water heater efficiently and professionally. Everything works perfectly now.

YEE VOON CHAN

Nicholas was brilliant and had installed my EV charger pretty quickly. Service was excellent and everything was completed in good time and there were no issues. I would highly recommend this company as you won’t be disappointed and I was happy with the price I was offered.

Money Punch TV

Frequently Asked Questions

What areas does Techfix Electric serve?

Techfix Electric operates out of Birmingham / West Midlands and provides solar panel installations, EV charging, and electrical services in Birmingham and surrounding areas.

Is Techfix Electric a certified solar installer?

Yes — they are MCS certified for solar installations.

Does Techfix Electric offer free quotes or consultations?

Yes — on their solar installation page, they advertise “Get a Quote” and provide solar installations from £4,995 fully installed.

Get a Free Solar Quote

Interested in Techfix Electric Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.