.png)
Swift Renewables is a UK-based renewable energy company specializing in solar PV systems, battery storage, and sustainable energy solutions for homes, businesses, and communities. With a reputation for reliability and technical expertise, the company delivers high-quality renewable installations that help clients reduce energy bills, achieve energy independence, and contribute to a cleaner environment.
The mission of Swift Renewables is to make the transition to renewable energy simple, cost-effective, and rewarding. Their vision is to support the UK’s journey toward net zero by empowering households and organizations with advanced solar and energy storage systems designed for long-term performance.
From consultation and bespoke design to professional installation and dependable aftercare, Swift Renewables provides complete end-to-end services. With a skilled team and customer-first approach, the company has built a strong reputation for professionalism, transparency, and sustainability, making them a trusted partner in the renewable energy sector.
Swift Renewables partners with trusted renewable energy brands to ensure reliable performance:



Swift Renewables operates with or in line with the following certifications:
Swift Renewables provides warranty coverage consistent with industry standards:
English
Several years of renewable energy expertise in the UK
Dozens of residential and commercial projects successfully completed
Had it about a month now and everything works better than I was expecting. The solar makes more power than I thought it would this time of year. It's just stopped raining in the photo and still making 3.2kw which is more than enough for the house and heatpump which also uses less power than I thought, I just leave it on 22c 24/7 and it heats the whole house better than the boiler did before.
We had a heat pump and seven radiators installed, including pipework, as our house previously only had two ancient storage heaters. So it was a lot of work – but the team at Swift worked tirelessly and got everything completed in the allotted time (just over a week). We were really impressed with the installation, and are so happy with our brand new system.
I had a fantastic experience with Swift Renewables — Stuart came out for my heat pump service and was absolutely brilliant. He was polite, friendly, and incredibly helpful throughout the visit. He took the time to walk me through everything he was doing, explained things clearly, and gave me some great advice going forward.
Swift provides solar PV, battery storage, and heat pump systems for both residential and commercial sectors.
The public site doesn’t list strict timelines, but for standard domestic systems it likely takes 1–3 days depending on system size, roof complexity, and permitting. You should ask them for their project schedule.
Yes — they mention helping customers access government funding and grants, and reduced VAT rates (where applicable) to make renewable systems more affordable.