Leeds

Sunuser Limited

Sunuser Limited provides solar, storage and power management services, helping clients maximize self-consumption and energy independence.
★★★★★  
5
👥
183
Reviews
🏆Elite+ Installer

About

Sunuser Limited is one of the UK’s established renewable energy specialists, with decades of experience in solar PV and sustainable energy solutions. Founded in 1979, the company has built a reputation for reliability, technical excellence, and customer-focused service, helping thousands of households and businesses transition to clean energy.

The mission of Sunuser Limited is to deliver high-quality, affordable, and efficient renewable energy systems that reduce energy costs and carbon emissions while providing long-term reliability. With a strong heritage in solar thermal and solar PV installations, the company combines expertise with innovation to design and deliver bespoke systems tailored to individual needs.

Sunuser Limited’s vision is to play a leading role in the UK’s journey toward net zero, providing energy solutions that not only benefit customers financially but also contribute to a greener, more sustainable environment. Their full-service offering includes consultation, design, installation, and aftercare, supported by a highly experienced team of renewable energy specialists.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar energy systems

✔️ Solar thermal system installations

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Solar panel servicing and maintenance

✔️ Energy efficiency consultation

Products & Manufacturers

Sunuser Limited works with globally recognized renewable energy manufacturers to ensure durability and performance:

  • Solar Panels: Trina Solar, Q CELLS, JA Solar, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • Solar Thermal: Worcester Bosch, Vaillant, Kingspan
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

157 Buslingthorpe Ln, Leeds LS7 2DQ, United Kingdom
44 113 262 0261
solar@sunuser.co.uk

Service Areas

Leeds

Certifications

Sunuser Limited holds or operates in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV and solar thermal systems.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – consumer protection and fair trading.
  • ISO 9001/14001 – quality and environmental management standards.

Warranty Information

Sunuser Limited provides comprehensive warranty coverage consistent with UK industry best practices:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Solar thermal systems – 5–10 years depending on manufacturer.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Over 40 years (founded in 1979)

Projects Completed

Thousands of residential and commercial renewable energy projects delivered across the UK

Customer Reviews

Read what our customers have to say about their experience with Sunuser Limited Solar Solutions

This was the second time Richard has been to our house. He is polite ,respectful and gives honest and good advice. Spotted an issue that needed fixing and did so promptly. Perhaps the charge for a straight forward antifreeze change no problem service could be a bit less.

Graham Francis

The engineer arrived about an hour late but apart from that he did a good job. He's been servicing our equipment for many years so he knows it well. Quite a satisfactory service visit.

Ruth Hawkes

Having bought a house with solar panels established I really didn't know much about the system other than it gave out lots of hot water. An old installation but still going strong but decided to have the 5 year service. Discussed this at length before the engineer called which put my mind at rest. Thorough service, fully checked. Very pleased.

Philippa Rabbidge

Frequently Asked Questions

How long has Sunuser been in business?

Sunuser was established in 1981 and has over 40 years of experience in solar thermal and photovoltaic systems.

What warranties does Sunuser offer on their installations?

They guarantee their installations for 2 years workmanship, panel manufacturer warranty of 10 years, and panel performance warranty of 25 years.

Has Sunuser installed many systems?

Yes — Sunuser claims to have installed over 50,000 solar panels nationwide.

Get a Free Solar Quote

Interested in Sunuser Limited? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.