London

Sunshinen Co.

Sunshinen Co. offers trusted solar panel and battery storage installation services across the UK with nationwide coverage, 24/7 support, and competitive pricing.
★★★★★  
5
👥
4
Reviews
🏆Elite+ Installer

About

Sunshinen Co. is a renewable energy company specializing in solar PV systems, battery storage, and sustainable energy solutions for residential and commercial clients. Based in the UK, the company is committed to providing affordable, high-quality solar technologies that enable customers to reduce energy costs, achieve greater energy independence, and contribute to a greener future.

The mission of Sunshinen Co. is to make renewable energy simple, practical, and cost-effective, ensuring that every installation meets the highest standards of safety and performance. With a skilled team of engineers and energy specialists, the company provides tailored solar systems that are designed to deliver long-term efficiency and environmental benefits.

Sunshinen Co. offers a full range of services, from consultation and system design through to installation and ongoing maintenance. With a vision of supporting the UK’s clean energy transition, the company continues to empower households and businesses to embrace solar power and sustainable energy practices.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging point installations

✔️ Solar system maintenance and aftercare

✔️ Energy audits and consultation

✔️ Financing and renewable support

Products & Manufacturers

Sunshinen Co. partners with trusted global renewable energy brands to ensure efficiency and reliability:

  • Solar Panels: Trina Solar, Q CELLS, JA Solar, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

3rd Floor, 86-90 Paul St, London EC2A 4NE, United Kingdom
448081348234
hello@sunshinenco.com

Service Areas

London

Certifications

Sunshinen Co. operates with or in line with recognized UK renewable energy certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV systems.
  • NICEIC – ensuring compliance with electrical safety regulations.
  • RECC (Renewable Energy Consumer Code) – fair consumer practices and protection.
  • ISO 9001/14001 – quality and environmental management standards.

Warranty Information

Sunshinen Co. provides warranties consistent with UK solar industry practices:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Several years of expertise in renewable energy installations

Projects Completed

Dozens of residential and commercial projects delivered successfully across the UK

Customer Reviews

Read what our customers have to say about their experience with Sunshinen Co. Solar Solutions

"WOW! SunShineCo's bird proofing installation is top-notch! 💯 They've installed a high-quality system with a LIFETIME WARRANTY, giving me complete peace of mind. Their team's expertise and professionalism are impressive. I'm loving the added protection for my solar panels and the guarantee that it'll last. Highly recommend SunShineCo for reliable and efficient bird proofing solutions! 👍"

shiv Solanki

"SunShineCo is a GAME CHANGER in the renewable energy industry! Their in-house team is absolute ROCKSTARS when it comes to solar panel cleaning and maintenance! Not only did they deliver exceptional service, but their professionalism, expertise, and attention to detail are truly unmatched. I'm blown away by their dedication to maximizing my solar panel's efficiency and overall performance. If you're looking for a reliable, efficient, and top-notch solar panel maintenance team, SunShineCo is the ONLY choice.

Tulsi Solanki

Thank you so much for taking the time to leave a review! We're glad to hear you were happy with the system health check we provided. It’s great to know you’ve chosen our maintenance plan with panel cleaning — a smart move to keep your solar system performing at its best.

colin gardner

Frequently Asked Questions

Is Sunshinen Co. a legitimate solar installer?

Yes, Sunshinen Co. is a UK-based renewable energy company providing solar PV installations and energy-saving solutions.

What areas does Sunshinen Co. serve?

They serve customers across London and surrounding regions, offering solar services for homes and businesses.

What warranties does Sunshinen Co. provide on panels and installation?

They provide manufacturer warranties on solar panels and professional installation guarantees for reliability.

Get a Free Solar Quote

Interested in Sunshinen Co.? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.