Birmingham

Sunergy Solar Installs Ltd

Sunergy Solar Installs designs and installs solar PV & energy storage systems, delivering dependable clean power to homes & firms.
★★★★★  
5
👥
6
Reviews
🏆Elite+ Installer

About

Sunergy Solar Installs Ltd is a UK-based renewable energy company specializing in solar PV systems, battery storage, and energy efficiency solutions. With a commitment to delivering high-quality installations and excellent customer service, the company helps households and businesses across the UK lower their energy costs, achieve energy independence, and reduce their carbon footprint.

The mission of Sunergy Solar Installs Ltd is to make clean energy accessible, affordable, and practical for everyone. By combining cutting-edge solar technologies with expert design and engineering, the company ensures that every project delivers maximum efficiency and long-term performance. Their vision is to contribute to the UK’s net zero targets by supporting the widespread adoption of renewable energy.

Sunergy Solar Installs Ltd offers end-to-end renewable energy solutions, from consultation and bespoke design to professional installation and aftercare. With years of experience and a strong reputation for reliability, the company is trusted by homeowners, businesses, and communities alike.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging point installations

✔️ Solar maintenance and servicing

✔️ Energy consultation and audits

✔️ Financing and renewable support options

Products & Manufacturers

Sunergy Solar Installs Ltd partners with leading renewable energy brands to ensure long-term reliability:

  • Solar Panels: Trina Solar, Q CELLS, JA Solar, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Park road, Tamworth B78 3HB, United Kingdom
44 7515 831805
info@recc.org.uk

Service Areas

Birmingham

Certifications

Sunergy Solar Installs Ltd operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV systems.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – consumer protection and fair business practices.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Sunergy Solar Installs Ltd provides warranties consistent with UK solar industry practices:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.

Company Details

Languages Spoken

English

Years in Business

Several years of expertise in renewable energy solutions

Projects Completed

Dozens of residential and commercial solar projects delivered successfully across the UK

Customer Reviews

Read what our customers have to say about their experience with Sunergy Solar Installs Ltd Solar Solutions

Due to the price of my bills I knew I wanted a solar system installed but I had no idea as to how it actually worked. After many quotes I met Dan who explained it in layman's term and was extremely knowledgeable. He was so approachable and answered all of my questions which I really appreciated, given the expense of this investment. I honestly cannot believe how much it has reduced my bills. The house does draw a lot of electricity due to having a hot tub etc,

Nicole Wattison

The lads did an amazing job installing my car charger and we extremely friendly, clean and professional. The attention to detail was great, from putting down mats to keep my carpet clean to keeping me updated, making sure I was happy with the location etc. I would highly recommend them.

Chris Moore

Having previously used Dan several years back for our house rewire and having had such a professional job done, we had no issues with reaching out to him when he advertised he was now installing solar panels also. Very much of the same with this job also, Dan was very patient with my many questions and queries and it was thoroughly explained and planned out to suit our needs perfectly. The job was carried out exactly when it was advised and was completed within the advised timeframe. It’s only been a few weeks but we have already noticed a significant reduction in our energy consumption.

Jordan N

Frequently Asked Questions

How can I determine if Sunergy Solar Installs Ltd is legitimate?

Verify their company registration (with the UK’s Companies House), check for customer reviews and past installation projects, and confirm relevant industry certifications (e.g., MCS).

What kinds of solar services does Sunergy Solar Installs provide?

They likely provide residential solar panel installation (PV systems), and may also offer battery integration and system monitoring (common services among UK solar installers).

Does Sunergy Solar Installs provide warranties and after-sales support?

Credible installers typically offer performance warranties on panels/inverters (10-25 years) and workmanship guarantees (e.g. 5-10 years). You should check their stated warranty terms directly on their site or contract.

Get a Free Solar Quote

Interested in Sunergy Solar Installs Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.