Belfast

Start Solar UK & Ireland

Start Solar UK & Ireland provides solar installation and support across the region, bridging technology and trust to power greener future homes.
★★★★★  
5
👥
403
Reviews
🏆Elite+ Installer

About

Start Solar UK & Ireland is a renewable energy company delivering high-quality solar PV systems, battery storage, and sustainable energy solutions across the UK and Ireland. With years of experience in the sector, the company has established itself as a trusted partner for residential, commercial, and industrial clients seeking reliable and affordable renewable technologies.

The mission of Start Solar is to make solar energy accessible, cost-effective, and future-ready, helping households and businesses reduce energy bills, achieve independence from rising energy costs, and lower their environmental impact. Their vision is to play a leading role in accelerating the adoption of renewable energy, supporting the UK and Ireland’s net zero ambitions.

Start Solar provides a full range of services, from consultation and system design to installation and aftercare, ensuring that every project is tailored to the customer’s specific energy needs. With a reputation for professionalism, technical excellence, and strong customer support, the company continues to expand its presence as a key player in the renewable energy market.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial and industrial solar systems

✔️ Battery storage integration

✔️ EV charging point installations

✔️ Solar system servicing and maintenance

✔️ Energy consultation and audits

✔️ Flexible financing and renewable support options

Products & Manufacturers

Start Solar UK & Ireland partners with globally recognized renewable brands to ensure reliable and efficient systems:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

9 Rathdown Cl, Lisburn BT28 2RB, United Kingdom
44 28 9202 7079
info@startsolargb.co.uk

Service Areas

Belfast

Certifications

Start Solar UK & Ireland operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – compliance with UK electrical and safety standards.
  • RECC (Renewable Energy Consumer Code) – consumer rights and fair trading.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Start Solar UK & Ireland provides warranties consistent with UK and Irish solar industry best practices:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Several years of experience in the UK and Irish renewable energy market

Projects Completed

Hundreds of residential, commercial, and industrial solar projects successfully delivered

Customer Reviews

Read what our customers have to say about their experience with Start Solar UK & Ireland Solar Solutions

Start Solar were excellent at guiding us through all the options we had when it came to adding solar and a battery to our house. From the initial phone chat with Suzie, to our assessment with Andrew, we were confident we had picked the right business to work with.

David Procter

Having spoken to a number of companies that did indeed seem to be the case, even if they would consider an installation given the height of the roof I was getting the impression I was being offered an “off the peg” package when I wanted it tailored to me .Andrew from Start Solar gave me that, face to face meeting to answer my many many questions, gave me confidence in dealing with this company.

Roger Gillespie

We recently had Andrew out to talk us through having solar panels installed at our house and within weeks had a fully installed system. From initial interaction, through installation and beyond I can only commend Start Solar for their professionalism, efficiency and transparency. I had done some research prior to meeting Andrew and he was very tuned in to my requirements and expectations and determined a setup best suiting my needs. We have an all electric house so solar generation will assist us massively in reducing bills and that was considered throughout. The installers and electrician where out within weeks and had panels and battery installed within a few hours. They were very clean, tidy and efficient and took

stereo441

Frequently Asked Questions

Do they operate in both UK & Ireland?

Yes — Start Solar shows offices in both Northern Ireland and the Republic of Ireland.

Do they offer free quotes / a contact form?

Yes — they have a “Get a Quote” form for residential, commercial, and other enquiries.

What are their main service types?

They provide solar for residential and commercial customers along with support around finance and grants.

Get a Free Solar Quote

Interested in Start Solar UK & Ireland? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.