Manchester

Spectra Solar Ltd

Spectra Solar Ltd provides solar PV system design, installation & servicing, enabling customers to harness renewable power reliably.
★★★★★  
5
👥
127
Reviews
🏆Elite+ Installer

About

Spectra Solar Ltd is a UK-based renewable energy company specializing in solar PV installations, battery storage, and energy efficiency solutions for both residential and commercial clients. With a reputation for professionalism, technical expertise, and excellent customer care, the company delivers tailored solar systems that help customers reduce energy bills, increase energy independence, and lower their carbon footprints.

The mission of Spectra Solar Ltd is to make renewable energy simple, accessible, and cost-effective while maintaining the highest standards of safety and quality. Their vision is to play a leading role in the UK’s clean energy transition, supporting the shift to net zero with efficient, future-ready technologies.

From consultation and bespoke design through to installation and aftercare, Spectra Solar Ltd provides complete end-to-end services. With a dedicated team of renewable energy specialists, the company has built a strong reputation for reliability, transparency, and long-term system performance.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging point installations

✔️ Solar maintenance and servicing

✔️ Energy consultation and audits

✔️ Flexible financing and renewable support

Products & Manufacturers

Spectra Solar Ltd works with trusted global renewable manufacturers to deliver reliable and efficient systems:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, Sonnen, LG Chem, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Spectra House, 13-15 Pennington St, Hindley, Wigan WN2 3AH, United Kingdom
44 1942 669601
info@spectrasolar.co.uk

Service Areas

Manchester

Certifications

Spectra Solar Ltd operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV systems.
  • NICEIC – ensuring compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – consumer protection and ethical practices.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Spectra Solar Ltd provides warranty coverage in line with UK solar industry best practices:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on product.

Company Details

Languages Spoken

English

Years in Business

Several years of experience in the UK renewable energy sector

Projects Completed

Dozens of residential and commercial solar projects successfully delivered

Customer Reviews

Read what our customers have to say about their experience with Spectra Solar Ltd Solar Solutions

If you’re reading this because you’re on the fence choosing a solar installer, then stop searching; these are the guys to use!I’m a bit of a geek about this stuff. So I did plenty of shopping around, and this is what I found:-- Some installers talked a good talk, but were also very expensive and pushy.-- Some were competitively priced, but I wouldn’t trust them with my property.-- Spectra came to me as a recommendation, which I’m glad I listened to!

Chris Hopwood

We’d been thinking of investing in Solar for some time and had numerous conversations with various providers until someone recommended Spectra. Wow, what a difference – absolutely no pressure, thoroughly knowledgeable and patience with all our ‘daft’ questions.

Ian Smith

Right from the start of the process I have had absolute confidence in the team at Spectra, no hard sell, honest opinions and a level of trust that is unusual these days.There were opportunities when they could have sold me additional equipment, however, Jonathan suggested that it would be better to wait and see before investing in additional battery storage which we may not need.

Lee Hodgetts

Frequently Asked Questions

What types of solar systems does Spectra Solar Ltd offer?

Spectra Solar supplies and installs Solar PV systems, battery storage, and smart EV chargers.

What certifications and accreditations does Spectra Solar hold?

They are accredited under MCS, NAPIT, HIES, and TrustMark.

What areas does Spectra Solar serve?

Though based in Wigan (Greater Manchester) their directory listings suggest they operate nationally across various UK regions.

Get a Free Solar Quote

Interested in Spectra Solar Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.