Glasgow

SolarEv Electrical Ltd

SolarEv Electrical integrates solar, EV charging and electrical systems into cohesive green power solutions for domestic and commercial projects.
★★★★★  
5
👥
15
Reviews
🏆Elite+ Installer

About

SolarEv Electrical Ltd is a UK-based renewable energy company specializing in solar PV installations, EV charging infrastructure, and battery storage solutions. Serving both residential and commercial clients, the company combines extensive electrical expertise with a strong focus on sustainability, delivering tailored energy systems that are efficient, affordable, and future-proof.

The mission of SolarEv Electrical Ltd is to make renewable energy simple and accessible, helping clients reduce energy bills, cut carbon emissions, and achieve greater independence from the grid. Their vision is to accelerate the UK’s clean energy transition by offering advanced solar technologies, reliable EV charging solutions, and long-term aftercare.

Known for professionalism, customer service, and technical precision, SolarEv Electrical Ltd provides end-to-end services including consultation, system design, installation, and ongoing support. Their skilled team of certified engineers ensures every project is delivered to the highest standards of safety and performance.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar PV systems

✔️ Battery storage solutions

✔️ EV charging station installations

✔️ Electrical contracting and upgrades

✔️ Solar maintenance and servicing

✔️ Energy audits and consultation

Products & Manufacturers

SolarEv Electrical Ltd partners with globally trusted renewable manufacturers to ensure efficiency and long-term performance:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, Sonnen, LG Chem, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

221 Clarkston Rd, Glasgow G44 3DS, United Kingdom
44 141 632 3128
info@cmssurveyors.co.uk

Service Areas

Glasgow

Certifications

SolarEv Electrical Ltd operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV systems.
  • NICEIC – electrical safety compliance.
  • RECC (Renewable Energy Consumer Code) – consumer rights and fair trading.
  • OZEV Approved – certified EV charging installers.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

SolarEv Electrical Ltd offers warranties aligned with UK solar and EV industry standards:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.
  • EV charging equipment – 3–5 years manufacturer’s warranty.

Company Details

Languages Spoken

English

Years in Business

Several years of renewable energy and electrical expertise

Projects Completed

Dozens of residential, commercial, and EV charging projects successfully delivered

Customer Reviews

Read what our customers have to say about their experience with SolarEv Electrical Ltd Solar Solutions

Would highly recommend SolarEv, especially Stewart! Communication was super clear and fast, prices were very reasonable and the work carried out was to a high standard. I’ll be back to them for any of my electrical work in the future.

matthew rose

I had SolarEV Electrical install solar panels and battery storage for me earlier this year. The service I received from Stewart, Craig and Jamie was nothing short of outstanding. They demonstrated themselves to be reliable, professional and committed to doing an excellent job in line with relevant professional standards. They communicated well and in a courteous manner and ensured they tidied up after themselves. They were keen to make sure I was happy with the work and dealt well with any queries I had. I would not hesitate to recommend SolarEV.

Russell Ogilvie

SolarEV installed and vented a bathroom extractor fan for me. I have used SolarEV previously and keep going back as they are reliable, professional, courteous, tidy and always do a good job to professional standards. I would have no hesitation in recommending SolarEV.

Elaine Gray

Frequently Asked Questions

What certifications should SolarEv have?

They should hold MCS certification (Microgeneration Certification Scheme) and ideally be members of RECC or equivalent trade bodies.

What maintenance services are included?

They likely include periodic inspections, cleaning, monitoring checks, and servicing of inverters and electrical components.

Does SolarEv also offer battery storage or EV charging?

Yes — many modern solar companies expand into battery storage and EV charger installations; SolarEv’s service offerings should confirm this.

Get a Free Solar Quote

Interested in SolarEv Electrical Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.