Bristol

Solar Wizard

Solar Wizard designs and installs solar PV, battery storage and control systems, aiming for optimal efficiency and lasting reliability for clients.
★★★★★  
👥
Reviews
🏆Elite+ Installer

About

Solar Wizard is a UK-based renewable energy company specializing in solar PV installations, battery storage, and energy efficiency solutions for residential and commercial clients. With a strong focus on sustainability, innovation, and customer satisfaction, the company designs and installs high-quality renewable energy systems that help customers cut energy costs, achieve energy independence, and reduce carbon footprints.

The mission of Solar Wizard is to make renewable energy accessible and affordable for every household and business, ensuring that clients benefit from long-term savings and sustainable technologies. Their vision is to support the UK’s transition to a net zero future by offering practical, efficient, and eco-friendly energy solutions tailored to customer needs.

From consultation and bespoke system design to installation and aftercare, Solar Wizard provides end-to-end services backed by expert engineering and reliable customer support. Known for its professionalism, transparency, and technical expertise, the company has established itself as a trusted partner in the UK solar industry.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar energy systems

✔️ Battery storage integration

✔️ EV charging point installations

✔️ Solar maintenance and servicing

✔️ Energy audits and consultation

✔️ Financing and renewable support

Products & Manufacturers

Solar Wizard partners with globally trusted renewable energy manufacturers to ensure quality and long-term reliability:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

St. James' Court, St James Parade, Bristol BS1 3LH, United Kingdom
solar@cse.org.uk

Service Areas

Bristol

Certifications

Solar Wizard operates with or in line with recognized UK certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV systems.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – ensuring consumer protection.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Solar Wizard provides warranty coverage consistent with UK solar industry best practices:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on product.

Company Details

Languages Spoken

English

Years in Business

Several years of experience in renewable energy installations

Projects Completed

Dozens of residential and commercial projects completed successfully across the UK

Customer Reviews

Read what our customers have to say about their experience with Solar Wizard Solar Solutions

Frequently Asked Questions

What is Solar Wizard?

Solar Wizard is an online tool that calculates how much solar generation a rooftop could achieve, including cost, output, and payback.

How do I use Solar Wizard?

You enter the address or postcode of a building, and the tool uses roof geometry, orientation and shading data to estimate solar viability.

Is Solar Wizard a company or just a tool?

It is not a solar installer but a solar assessment tool developed by the Centre for Sustainable Energy (CSE) to support households, communities and local authorities.

Get a Free Solar Quote

Interested in Solar Wizard? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.