London

Solar Sparky Electrical Ltd

Solar Sparky Electrical Ltd offers professional solar panel installations, battery solutions, and EV charger services for residential and commercial customers.
★★★★★  
5
👥
74
Reviews
🏆Elite+ Installer

About

Solar Sparky Electrical Ltd is a UK-based renewable energy and electrical services provider, specializing in solar PV installations, battery storage, and sustainable energy solutions. With expertise rooted in professional electrical contracting, the company delivers safe, efficient, and reliable solar energy systems tailored to the needs of both residential and commercial clients.

The company’s mission is to help households and businesses transition to renewable energy by providing high-quality, affordable solar solutions that reduce energy costs and carbon footprints. Their vision is to support the UK’s journey toward a greener, more sustainable future by empowering clients with clean, independent power systems.

With a strong reputation for professionalism and customer satisfaction, Solar Sparky Electrical Ltd provides end-to-end solutions from consultation and design to installation and aftercare. Their team of skilled engineers ensures every project is delivered to the highest industry standards, guaranteeing safety, performance, and long-term reliability.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Electrical contracting and upgrades

✔️ Solar system maintenance and servicing

✔️ Energy audits and consultation

Products & Manufacturers

Solar Sparky Electrical Ltd works with leading renewable technology manufacturers to ensure efficiency and long-term reliability:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Thistle House, 77 81 Ilderton Rd, London SE16 3JU, United Kingdom
447733325898
info@solarsparkyelectrical.co.uk

Service Areas

London

Certifications

Solar Sparky Electrical Ltd operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – compliance with UK electrical safety regulations.
  • RECC (Renewable Energy Consumer Code) – ensuring fair consumer practices.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Solar Sparky Electrical Ltd offers warranty coverage consistent with industry standards:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.

Company Details

Languages Spoken

English

Years in Business

Several years of operation in the UK renewable and electrical services sector

Projects Completed

Dozens of residential and commercial solar installations completed successfully

Customer Reviews

Read what our customers have to say about their experience with Sunergy Solar Solutions

David and his team did an amazing job on designing, installing and commissioning our solar system. David went out of his way to make sure he maximised the full potential of our property and we are looking forward to seeing the benifits in the years to come. I highly recommend Solar Sparky Electrical for anyone who is looking to have solar installed as you will definitely get a better custom solution than other larger commercial companies would provide. Honest, reliable and professional, you can't get better and we are very happy.

Aaron Butterfield

We had an emergency where one of our plug circuits stopped working. He came over that day, identified issues with the switch board, came up with a quote and came back the following day and fixed it. He is hard working, has integrity and stuck to the price. The workmanship came with a two year warranty. We have an old house and had teething problems with one of the circuits and he came over straight away and fixed it at no charge. I would recommend him.

Paul Tecklenberg

I posted my job on Checkatrade and Dave from Solar Sparky called me back, asking for a photo of the fuse box. Once he had this he talked me through the process of switching things off and on. All fixed with no charge!!! Absolutely brilliant service: best ever!!!

Helen Matthews

Frequently Asked Questions

Is Solar Sparky Electrical Ltd a legitimate solar installer?

Yes, Solar Sparky Electrical Ltd is a certified and trusted UK installer, offering both electrical and renewable energy services.

What types of solar panels does Solar Sparky Electrical Ltd use?

They use high-quality, efficient solar panels from reliable manufacturers to ensure strong performance and longevity.

What warranties does Solar Sparky Electrical Ltd provide on panels and installation?

The company provides manufacturer warranties on equipment and installation guarantees for customer peace of mind.

Get a Free Solar Quote

Interested in Sunergy? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.