.png)
Solar Surveys is a UK-based renewable energy company specializing in solar PV inspections, system performance analysis, and independent energy surveys. With extensive expertise in the solar industry, the company provides homeowners, businesses, and installers with accurate, reliable insights to ensure solar systems are operating at peak efficiency.
The mission of Solar Surveys is to deliver independent, trusted advice and technical assessments that help clients maximize the performance and longevity of their solar energy systems. Their vision is to be the UK’s go-to provider for solar inspections, supporting the renewable energy industry with transparent reporting and professional expertise.
By using advanced testing tools and drawing on years of experience, Solar Surveys delivers a range of services including performance checks, fault detection, shading analysis, and commissioning reports. The company’s customer-focused approach ensures that every client receives a clear understanding of their system’s performance and tailored recommendations for improvement.
As an independent service provider, Solar Surveys does not sell products directly but works with systems from all major manufacturers, including:



Solar Surveys operates with or in line with industry-recognized certifications:
As an inspection and survey specialist, Solar Surveys does not directly install products but provides support and recommendations that align with standard warranties in the solar industry:
English
Several years of experience in solar energy inspections and consultancy
Hundreds of independent solar surveys conducted across the UK
Solar Surveys exceeded expectations with their roof condition survey and solar PV suitability assessment. Their professional team utilised advanced drone technology to deliver high-resolution imagery and clear, actionable insights. The comprehensive report, coupled with seamless communication and timely delivery, has enabled effective planning for energy efficiency and long-term savings. True leaders in their field!
Use Solar Surveys’ services to assess roof suitability, shading, orientation, and system design — their surveys help clients compare and pick reliable installers.
Often survey firms offer free or low-cost site assessments to generate proposals — check Solar Surveys’ site for their survey package.
The survey should provide conservative performance estimates; installers often guarantee a minimum output or provide monitoring to verify performance.