Tyneside

Solar Shack

Solar Shack brings bespoke solar PV installations, maintenance and design services, focused on delivering dependable, sustainable energy solutions nationwide.
★★★★★  
5
👥
158
Reviews
🏆Elite+ Installer

About

Solar Shack is a UK-based renewable energy company dedicated to providing affordable, efficient, and sustainable solar PV systems for homes and businesses. With a focus on delivering practical clean energy solutions, the company offers solar panels, battery storage, and related renewable products designed to reduce energy bills, increase energy independence, and support the UK’s transition to net zero.

The mission of Solar Shack is to make renewable energy more accessible by offering cost-effective, high-quality solar technologies backed by expert installation and support. Their vision is to help communities embrace clean power and sustainable living while ensuring long-term system performance and customer satisfaction.

With years of experience in the renewable energy sector, Solar Shack provides customers with clear advice, reliable installations, and dependable aftercare services. By combining technical expertise with a customer-first approach, the company has earned a strong reputation as a trusted partner for solar solutions in the UK.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar systems

✔️ Battery storage integration

✔️ EV charging point installations

✔️ Solar panel servicing and maintenance

✔️ Energy consultation and audits

✔️ Affordable renewable product supply

Products & Manufacturers

Solar Shack partners with trusted renewable energy manufacturers to ensure quality and performance:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Unit 17 Green Lane Workspace, N Seaton Rd, Ashington NE63 0EF, United Kingdom
44 7479 351951
facebook@solarshack.co.uk

Service Areas

Tyneside (Newcastle etc.)

Certifications

Solar Shack operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV systems.
  • NICEIC – compliance with electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – consumer protection and ethical practices.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Solar Shack provides warranty coverage aligned with UK solar industry best practices:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Several years of renewable energy and solar expertise

Projects Completed

Dozens of residential and commercial solar projects across the UK

Customer Reviews

Read what our customers have to say about their experience with Solar Shack Solar Solutions

I approached Solar Shack on recommendation after the flexible solar panel on our camper failed. Right from the off Colin gave great advice on replacement and I felt that they were the people to hand the replacement. We travelled from the Midlands and spent a few days in the area. We dropped the van off and true to his promise the job was complete by early afternoon. Delighted with the service and the job by the team at Solar Shack.

David Ambler

An excellent service from Solar Shack, from my initial phone enquiry through to the install the whole process was a fantastic experience.I opted for a 390 watt solar panel with a Bluetooth controller, the workmanship was top notch & very professional & completed within 6 hours from drop off to pick up.Highly recommended

KEITH MORRISON

Excellent service,New solar panel,inverter battery and charge controller fitted,also the owner drove me into town and then picked me up after the job was finished.Top man ,first rate work ,will recommend to my friends and family 😀

Frank Sanderson

Frequently Asked Questions

What does Solar Shack specialize in?

Solar Shack specializes in off-grid solar kits and installations for campervans, motorhomes and touring caravans, not typical rooftop home systems.

Do they require a deposit?

No — they promote “no-deposit” bookings; payment is often made on the day of install.

Where is their workshop / how do they serve clients?

Their workshop is located in Ashington, Northumberland, and clients bring their vehicles or schedule installations accordingly.

Get a Free Solar Quote

Interested in Solar Shack? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.