Glasgow

Solar Panel Bird Proofing

Solar Panel Bird Proofing specializes in preventing bird damage to solar installations with tailored mesh and mitigation systems for long-term panel safety.
★★★★★  
5
👥
33
Reviews
🏆Elite+ Installer

About

Solar Panel Bird Proofing is a UK-based specialist company focused on protecting solar PV systems from bird-related damage and debris. With extensive expertise in solar panel care, the company provides professional bird-proofing solutions that extend the lifespan of panels, improve system efficiency, and prevent costly repairs.

Their mission is to ensure that customers’ solar investments perform at their best by safeguarding panels against nesting, droppings, and damage caused by pigeons and other birds. With a vision of helping UK households and businesses maintain clean, efficient, and long-lasting renewable energy systems, Solar Panel Bird Proofing delivers tailored solutions that combine durability, safety, and effectiveness.

The company’s team of skilled technicians offers comprehensive installation of bird-proofing mesh, spikes, and other protective solutions designed specifically for solar arrays. Known for reliability and customer care, Solar Panel Bird Proofing is a trusted partner for solar owners who want peace of mind and maximum return on their renewable energy investment.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Solar panel bird-proofing mesh installation

✔️ Pigeon deterrent and control systems

✔️ Solar panel cleaning and maintenance

✔️ Solar PV system inspections

✔️ Residential and commercial solar protection services

✔️ Energy efficiency consultation (with installer partners)

Products & Manufacturers

Solar Panel Bird Proofing supplies and installs specialist products to protect panels, working in collaboration with renewable manufacturers and installers:

  • Protective Mesh and Clips: Designed for solar PV systems
  • Bird Spikes and Netting: Pigeon and nesting deterrents
  • Solar Panels (via partners): Trina Solar, Q CELLS, JA Solar, SunPower
  • Inverters (via partners): SolarEdge, SMA, Fronius
  • Battery Storage (via partners): Tesla Powerwall, LG Chem, Sonnen

Project Gallery

Contact Information

Kennington, United Kingdom
44 141 433 7335
info@solarpanelbirdproofingkent.co.uk

Service Areas

Glasgow

Certifications

Solar Panel Bird Proofing operates with or in line with:

  • MCS (Microgeneration Certification Scheme) – working alongside certified solar installers.
  • NICEIC – ensuring compliance with electrical safety when working with PV systems.
  • RECC (Renewable Energy Consumer Code) – consumer protection and ethical practices.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Solar Panel Bird Proofing offers warranties in line with industry practices:

  • Bird-proofing mesh and fittings – typically 5–10 years.
  • Solar panels (via manufacturer) – 20–25 years performance warranty.
  • Workmanship/installation – 5–10 years, depending on the service.

Company Details

Languages Spoken

English

Years in Business

Several years of dedicated service in solar panel protection

Projects Completed

Dozens of residential and commercial solar protection projects successfully completed across the UK

Customer Reviews

Read what our customers have to say about their experience with Solar Panel Bird Proofing Solar Solutions

Mark was very quick and easy to deal with returning a very competitive quote for the work. It was carried out to a high standard and even when the weather didn’t play ball he returned to finish the very last cleaning job a few days later.

Ian Field

In September 2024 last year I engaged with looking for a company to pigeon proof my solar panels. After contacting a number of companies I shortlisted solar panel bird proofing Kent for a number of reasons:Mark was quick to respond and have sound advice. He didn't just try and sell me a product, but something that would suit it needs.

Patrick Reid

Mark provided excellent pigeon removal and solar panel pigeon proofing services. They acted quickly to remove a pigeon from our house (even after I sent them to the wrong address!) and installed bird-proofing on our solar panels as well as cleaning the panels, gutters and patio area. Mark's communication was brilliant throughout the whole job and he kept me updated, arrived promptly, and completed a neat, professional job. Highly recommend for anyone needing pigeon control or solar panel bird proofing. The pigeons have now departed and it is now a pleasure to sit in the garden again!

Kelly green

Frequently Asked Questions

What does “solar panel bird proofing” involve?

Bird proofing usually involves installing mesh, skirts or barriers that prevent birds from nesting under or behind solar panels.

Why is bird proofing important for solar panels?

Birds nesting under panels can damage wiring, produce droppings that reduce efficiency, and cause maintenance issues.

How much does bird proofing typically cost?

The cost varies: for example, mesh systems are often priced per metre; average costs for pigeonproofing a 2-m² panel can run from £300–£600 depending on method and scale.

Get a Free Solar Quote

Interested in Solar Panel Bird Proofing? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.