Manchester

Solar Maintenance Solutions

Solar Maintenance Solutions specializes in upkeep and servicing of solar arrays and energy systems, ensuring optimal performance and longevity.
★★★★★  
5
👥
226
Reviews
🏆Elite+ Installer

About

Solar Maintenance Solutions is a UK-based company specializing in the servicing, repair, and optimization of solar PV systems. With a strong focus on ensuring long-term performance, the company provides expert maintenance services for both residential and commercial clients, helping them maximize the efficiency and lifespan of their solar investments.

The mission of Solar Maintenance Solutions is to keep solar systems running at peak efficiency, reducing downtime, and ensuring clients receive the best return on their investment. Their vision is to support the UK’s renewable energy growth by maintaining and protecting existing solar installations, enabling communities to benefit fully from clean energy.

With years of industry experience and a team of skilled engineers, the company offers tailored maintenance plans, emergency repair services, and system performance audits. Known for reliability, transparency, and technical expertise, Solar Maintenance Solutions has become a trusted partner for homeowners, businesses, and organizations seeking dependable solar aftercare.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Solar PV system maintenance

✔️ Emergency solar system repairs

✔️ Residential solar aftercare services

✔️ Commercial solar maintenance contracts

✔️ Battery storage servicing and repairs

✔️ Performance monitoring and optimization

✔️ Inverter replacement and system upgrades

✔️ Consultancy and energy audits

Products & Manufacturers

Solar Maintenance Solutions services and supports products from a wide range of global solar brands:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD

Project Gallery

Contact Information

13Th Floor, City Tower, New York St, Manchester M1 4BT, United Kingdom
44 800 099 6606
info@solarutilityproject.com

Service Areas

Manchester

Certifications

Solar Maintenance Solutions operates with or in line with recognized UK renewable certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV systems.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – consumer protection and ethical practices.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

While Solar Maintenance Solutions focuses primarily on aftercare, they also work with manufacturers’ warranties and provide coverage for their services in line with industry standards:

  • Solar panels – manufacturer warranties typically 20–25 years.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/repairs – 1–5 years depending on service.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Several years of expertise in solar maintenance and renewable energy solutions

Projects Completed

Dozens of residential and commercial solar maintenance projects successfully carried out

Customer Reviews

Read what our customers have to say about their experience with Solar Maintenance Solutions Solar Solutions

Had a great experience with our installation. It’s very neat and tidy the guys that installed the system were really helpful and nothing was too much trouble for them highly recommend them

adele pearson

We just had a full new inverter, 10kW battery and electrical rewiring done by Solar Maintenance Solutions (Andy, Jan and Luke). From start to finish, all 3 of them have done a phenomenal job and got our solar panel system working again (apart from 1 damaged panel - not their fault - Andy sourced a new panel which will be all fitted on Tuesday and then we have the full thing working at its optimum).

Ghazanfar Aslam

Solar Maintenance Solutions helped me with my leaky roof underneath my solar panels. They set up the scaffolding, clearing vegetations that was growing out of the roof, repaired the broken tile and protected panel from pigeons going underneath them again. Andrew was friendly, easy to talk to , responsive and helped me solve the problem. I would recommend their services.

Samuel Wong

Frequently Asked Questions

What maintenance services are included?

Solar Maintenance Solutions specializes in servicing, cleaning, inspection, performance checks, repairs, etc., to keep systems operating optimally.

How long will it take for solar panels to pay for themselves (ROI)?

With maintenance services, panels may perform closer to rated capacity longer — typical payback times in the UK (depending on energy costs, subsidies) are ~7 to 12 years.

Does Solar Maintenance Solutions offer monitoring or warranty support?

Yes — they typically provide monitoring, performance reports, fault detection, and after-sales support to ensure system longevity.

Get a Free Solar Quote

Interested in Solar Maintenance Solutions? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.