Leeds

Solar Green Solutions UK

Solar Green Solutions UK designs, installs and maintains solar and energy storage systems, aiming for clean, cost-effective power for their clients.
★★★★★  
5
👥
21
Reviews
🏆Elite+ Installer

About

Solar Green Solutions UK is a renewable energy company committed to delivering high-quality solar PV installations, battery storage systems, and sustainable energy solutions to residential and commercial clients across the UK. With a focus on affordability, innovation, and customer care, the company empowers clients to reduce energy bills, achieve energy independence, and support the UK’s transition to a greener future.

The mission of Solar Green Solutions UK is to make solar energy accessible and practical for every household and business by offering bespoke systems that combine advanced technology with expert workmanship. Their vision is to contribute to the UK’s net zero targets by helping communities adopt clean, renewable technologies that deliver long-term savings and environmental benefits.

Known for professionalism, transparency, and reliable service, Solar Green Solutions UK provides end-to-end solutions—from consultation and design to installation and ongoing support. Their skilled team ensures that every project is completed to the highest industry standards, building long-term trust with clients nationwide.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging point installations

✔️ Solar system servicing and maintenance

✔️ Energy consultation and audits

✔️ Financing and renewable support

Products & Manufacturers

Solar Green Solutions UK works with trusted renewable energy brands to ensure reliability and efficiency:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

32a Albion St, Castleford WF10 1EN, United Kingdom
44 1977 367537
operations@solargreensolutions.co.uk

Service Areas

Leeds

Certifications

Solar Green Solutions UK operates with or in line with recognized UK renewable certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – fair trading and consumer protection.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Solar Green Solutions UK provides warranty coverage consistent with UK solar industry best practices:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.

Company Details

Languages Spoken

English

Years in Business

Several years of operation in the UK renewable energy sector

Projects Completed

Dozens of residential and commercial projects successfully delivered

Customer Reviews

Read what our customers have to say about their experience with Solar Green Solutions UK Solar Solutions

Fantastic service from the first contact through to installation. After an absolute nightmare with Octopus Energy I spoke to Aron who organised a quote, deposit and install date taking just 9 days from first call to my Ohme home pro being installed.

Richard Roberts

Cant fault Solar Green at all, survey for EV charger carried out very quickly, price was spot on and very reasonable for a quality product which was installed quickly. Everyone was very helpful and professional and the installer Tom was really helpful. All in all Aaron and his team were superb.Thank you

Martin Stainforth

Solar Green solutions installed the solar panels for our church where we run a busy foodbank. From start to finish both Aron & Tom, have been a pleasure to deal with and most accommodating in working with our needs and budget. A short time after installation, there was a minor fault, and Aron arranged for this to be rectified straight away, which was most reassuring. I do believe that they are a firm that genuinely want the best for their clients.

Linzie Hogan

Frequently Asked Questions

What areas does Solar Green Solutions UK serve?

Solar Green Solutions is based in Yorkshire (Castleford) and they advertise serving Yorkshire, Lancashire, Wakefield, York, and surrounding regions.

What warranties does Solar Green Solutions provide on panels and installation?

They advertise “premium quality, guaranteed” and “insurance-backed workmanship warranty” along with product warranties (panel/inverter) as part of their offering.

Does Solar Green Solutions also offer EV charger installations or battery storage?

Yes — they say “Beyond Solar: we offer a comprehensive suite of renewable energy solutions, including EV chargers” on their website.

Get a Free Solar Quote

Interested in Solar Green Solutions UK? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.