Glasgow

Solar Dynamix UK Limited

Solar Dynamix UK delivers solar PV installations, battery storage and sustainable energy solutions across the UK, backed by family values and technical strength.
★★★★★  
4
👥
13
Reviews
🏆Elite+ Installer

About

Solar Dynamix UK Limited is a renewable energy company based in the UK, specializing in solar PV systems, battery storage solutions, and sustainable energy technologies for both residential and commercial clients. With a strong emphasis on quality, innovation, and customer service, the company provides tailored solar solutions designed to cut energy bills, reduce carbon footprints, and provide long-term energy independence.

The mission of Solar Dynamix UK Limited is to make renewable energy simple, practical, and accessible for everyone. Their vision is to help drive the UK’s clean energy transition by delivering cutting-edge solar systems that combine performance, affordability, and sustainability.

By offering complete end-to-end solutions—including consultation, design, installation, and aftercare—Solar Dynamix UK Limited ensures each client receives a system that fits their specific energy needs. Known for its professionalism, technical expertise, and customer-first approach, the company has built a reputation as a trusted renewable energy provider across the UK.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Solar panel servicing and maintenance

✔️ Energy audits and consultancy

✔️ Flexible financing and renewable support options

Products & Manufacturers

Solar Dynamix UK Limited partners with leading renewable technology providers to ensure efficiency and reliability:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, Sonnen, LG Chem, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Solar Dynamix, Unit 16, Darrow’s Estate, John Brannan Way, Bellshill, United Kingdom
44 1698 225520
Enquiries@solardynamixuk.co.uk

Service Areas

Glasgow

Certifications

Solar Dynamix UK Limited operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – ensuring compliance with electrical safety regulations.
  • RECC (Renewable Energy Consumer Code) – consumer protection and fair trading.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Solar Dynamix UK Limited offers warranties in line with UK solar industry standards:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Several years of experience in renewable energy installations

Projects Completed

Dozens of residential and commercial projects successfully delivered across the UK

Customer Reviews

Read what our customers have to say about their experience with Solar Dynamix UK Limited Solar Solutions

I had a suitability survey carried out by Solar Dynamix, and after a very interesting and informative discussion I decided to go ahead with the project to use solar energy to charge my EV car. It was actually quite pleasant to have my semi-techy questions answered but with no sales pitch or pressure to buy. A date and time was agreed for the work to be done and the team were on site promptly and ready to go. The panels, battery, etc were up and running before the day was over and I was happily generating power. And there was no mess to clean up, other than the installation itself, there was no indication that they had been here...

Jim Savage

Great company to offer a product,and take a payment as quick as possible. Once you pay money - forget about their responsibility. They will ignore you, they will avoid you. For your safety of mental health - don't start with them.Comment after reply:

Aleksandr Laporionok

I've just had Solar Dynamix UK replace my 13 year old panels with new more efficient ones, then adding another battery to my system making it more or less 10 years future proofed. All of this after a system inspection, a clear no nonsense quote , my questions answered clearly, guarantee/annual inspections agreed, a date set for install a few days later. SIMPLE !!!! Everything happened as discussed no mess, on time and no hassle. Speak to Kieran he is very helpful as was Stuart. I now have a new hobby checking how much more electricity I'm generating, how much I'm using and how much I'm selling back to the grid. Happy days!!!!

Eleanor Lee

Frequently Asked Questions

What maintenance or repair services does Solar Dynamix offer?

They offer solar PV servicing, repair, fault diagnosis, and performance checks for systems of all sizes.

Do they provide free quotes or consultations?

Yes — they provide a complimentary no-obligation quote.

What warranties or guarantees do they use?

They offer an Insurance Backed Guarantee (IBG) on their work.

Get a Free Solar Quote

Interested in Solar Dynamix UK Limited? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.