Glasgow

SM Electrical Services Ltd

SM Electrical Services installs and maintains electrical & solar systems with a commitment to quality, safety and sustainable performance.
★★★★★  
5
👥
17
Reviews
🏆Elite+ Installer

About

SM Electrical Services Ltd is a UK-based electrical contracting and renewable energy company offering professional solar PV installations, battery storage, and a wide range of electrical services. Known for its technical expertise and customer-focused approach, the company serves both residential and commercial clients with high-quality, efficient, and affordable solutions.

The mission of SM Electrical Services Ltd is to deliver safe, reliable, and sustainable energy systems that meet modern energy needs while supporting the UK’s transition to a low-carbon future. Their vision is to be a trusted partner for homes and businesses looking to embrace clean energy and benefit from reduced energy bills and greater independence.

With years of experience in electrical services and renewable installations, the company offers end-to-end solutions, from consultation and design through to installation and aftercare. SM Electrical Services Ltd is recognized for professionalism, dependable customer service, and a commitment to quality workmanship, making them a trusted name in the renewable and electrical sector.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Full electrical contracting services

✔️ Solar maintenance and repairs

✔️ Energy efficiency consultation

Products & Manufacturers

SM Electrical Services Ltd partners with reliable renewable energy manufacturers to ensure performance and durability:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

27A Montrose Ave, Hillington, Glasgow G52 4LA, United Kingdom
44 141 366 3900
info@smelectricalservices.co.uk

Service Areas

Glasgow

Certifications

SM Electrical Services Ltd operates with or in line with recognized UK certifications:

  • MCS (Microgeneration Certification Scheme) – certified renewable energy installations.
  • NICEIC – ensuring compliance with electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – protecting consumer rights.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

SM Electrical Services Ltd offers warranties consistent with industry standards:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Several years of experience in electrical and renewable energy services

Projects Completed

Dozens of residential and commercial projects delivered across the UK

Customer Reviews

Read what our customers have to say about their experience with SM Electrical Services Ltd Solar Solutions

After much searching and bad experience with salesmen from national companies, I eventually decided to appoint a company who had en electrical background. Spoke with Stuart Hope and explained what I wanted he patiently took me through solar systemsAnd provided a comprehensive quotation.

Ian Rogers

1st class pofessional service from SM Electrical with very good costs (and I always shop about!).Highly recommend Steven and the team for any works you might have as they provide excellent communication around the work, all left tidy, with flexibility to suit.

Martin Kelly

I highly recommend SM Electrical Services for the installation of an electric vehicle charger. They are an experienced, skilled team providing a highly professional service. The installer took time to discuss the site work, recommended a discrete route for cabling and ensured the system functioned to our satisfaction.

Graham Shopping

Frequently Asked Questions

How many years of experience does SM Electrical Services have?

They claim over 30 years of electrical experience, which they use to support their solar & battery work.

Are they accredited or certified?

Their engineers are NICEIC certified.

Does SM Electrical Services offer free quotes or consultations?

Yes — they offer free quotations.

Get a Free Solar Quote

Interested in SM Electrical Services Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.