Birmingham

Simple Green Energy Ltd

Simple Green Energy Ltd (UK) provides sustainable home-energy solutions including solar, insulation, heat pumps & grant assistance.
★★★★★  
4
👥
98
Reviews
🏆Elite+ Installer

About

Simple Green Energy Ltd is a UK-based renewable energy and sustainability company providing solar PV systems, battery storage, and energy efficiency solutions for households and businesses. With a strong emphasis on simplicity, affordability, and long-term reliability, the company designs and installs renewable systems that help clients cut energy costs, achieve energy independence, and reduce their carbon footprints.

The mission of Simple Green Energy Ltd is to make the transition to renewable energy straightforward and accessible by offering transparent advice, high-quality products, and exceptional customer service. Their vision is to play a vital role in the UK’s net zero journey by equipping homes and businesses with sustainable technologies that deliver measurable benefits.

With a dedicated team of renewable energy professionals, the company provides end-to-end services, including consultation, design, installation, and aftercare. Known for its customer-first approach and technical expertise, Simple Green Energy Ltd has become a trusted partner for clients seeking to embrace clean energy with confidence.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar energy systems

✔️ Battery storage integration

✔️ EV charging point installations

✔️ Solar system maintenance and servicing

✔️ Energy audits and efficiency consultation

✔️ Flexible financing and renewable support options

Products & Manufacturers

Simple Green Energy Ltd partners with trusted renewable manufacturers to deliver reliable, high-performance systems:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Studio 9, 50-54 St Paul's Square, Birmingham B3 1QS, United Kingdom
44 121 707 8369
contactus@simplegreenenergy.org

Service Areas

Birmingham

Certifications

Simple Green Energy Ltd operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV systems.
  • NICEIC – compliance with electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – ensuring consumer protection and ethical trading.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Simple Green Energy Ltd provides warranty coverage aligned with UK solar industry best practices:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.

Company Details

Languages Spoken

English

Years in Business

Several years of renewable energy and sustainability expertise

Projects Completed

Dozens of residential and commercial renewable projects completed successfully

Customer Reviews

Read what our customers have to say about their experience with Simple Green Energy Ltd Solar Solutions

I applied through EDF, I was sent a questionnaire, which was easy to complete. I was contacted, by Simply Green for a surveyor to come and assess our property, the assessment took about one and half hours. 3 days later i received a report with the recommendations, I received a phone call to arrange for the work to be carried out.

Len Witts

An excellent service from the beginning till end. Also good to know they cared to find out about the work. Good liaison with the client and workman which offers good reassurance. I wish they can offer solar panel services too. Being pensioner its a hard life where few cares.

Prakash Pandya

I filled out a form on Facebook, I received a call from their team. Nina spoke to me and asked me a few questions to check my eligibility, I told her that I don't have any benefits and my income was over £31,000.... Still, she went beyond and tried to qualify me through other ways, the survey was done at our property on the very next day. They gathered the information and also explained to us the use of the data and pictures. In the Next 4-5 days, I received a text and call from their install manager and they arranged my Cavity wall insulation. A guy named Karl came to the property. He first assessed the property, explained to us the property process and then started working. He was very quick seemed like an expert in his job, he finished the insulation in 4 hours. I also got all the warranty documents..

Aditya Aman

Frequently Asked Questions

Does Simple Green Energy offer solar systems and storage solutions?

Yes — they provide solar panels, power storage systems, and Tesla Powerwall installations.

What areas does Simple Green Energy serve?

Their site indicates operations across England and Wales, assisting households with energy efficiency and renewables.

Is Simple Green Energy Ltd still an active company?

The company is listed as dissolved in Companies House records (dissolved on 26 January 2016).

Get a Free Solar Quote

Interested in Simple Green Energy Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.