Sheffield

Seven Hills Solar

Seven Hills Solar specialises in designing and installing solar PV systems, helping clients reduce energy bills with tailored, efficient renewable solutions.
★★★★★  
5
👥
12
Reviews
🏆Elite+ Installer

About

Seven Hills Solar is a UK-based renewable energy company dedicated to providing high-quality solar PV systems, battery storage, and sustainable energy solutions for homes and businesses. Based in Sheffield, the company takes its name from the city’s iconic seven hills and has established itself as a trusted local provider committed to helping communities reduce energy bills and embrace clean, renewable technologies.

Seven Hills Solar’s mission is to make solar energy accessible, affordable, and practical for every customer. Their vision is to contribute to the UK’s net zero journey by delivering tailored renewable systems that combine cutting-edge technology with expert installation and reliable aftercare.

With a customer-first approach, Seven Hills Solar offers end-to-end services from consultation and system design to installation and long-term maintenance. Known for professionalism, transparency, and strong after-sales support, the company continues to build a reputation as a reliable partner in the renewable energy sector across Sheffield and beyond.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar systems

✔️ Battery storage solutions

✔️ EV charging point installations

✔️ Solar servicing and maintenance

✔️ Energy efficiency consultation

✔️ Flexible financing and renewable support

Products & Manufacturers

Seven Hills Solar works with globally trusted renewable energy manufacturers to ensure performance and durability:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

The Circle, 33 Rockingham Ln, Sheffield City Centre, Sheffield S1 4FW, United Kingdom
44 7878 639582
hello@sevenhillssolar.co.uk

Service Areas

Sheffield

Certifications

Seven Hills Solar operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – consumer protection and fair trading.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Seven Hills Solar provides warranty coverage aligned with UK solar industry practices:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on product.

Company Details

Languages Spoken

English

Years in Business

Several years of operation in Sheffield and the wider UK renewable energy market

Projects Completed

Dozens of residential and commercial installations successfully delivered

Customer Reviews

Read what our customers have to say about their experience with Seven Hills Solar Solar Solutions

I recently had Seven Hills Solar install a solar PV system with a Tesla Powerwall 3 and Gateway at my home, along with two Hypervolt Home Pro 3 EV chargers with demand management. From start to finish, the team were brilliant — professional, well-coordinated, and highly skilled. The installation was exceptionally neat and tidy, with clear attention to detail. Everything was explained thoroughly, and the whole process felt smooth and stress-free. I’m very impressed with both the quality of the work and the customer service. Highly recommended!

Lee B

Great job start to finish from Jon & co. Blink and you'll miss the installation. Better handover docs than I've seen from big name business vendors.

Jake Cooper

Jonathan is an experienced solar designer and as a qualified electrician myself, i was particularly fussy in my selection of an MCS accreddited installer. Jonathan has done an awesome job. Perfect for everything from 4 panels to 400.

Peter Monfort

Frequently Asked Questions

What types of solar systems does Rob Murphy Heating offer?

They specialize in solar thermal / hot water systems — installation, servicing & repair of solar hot water systems.

Does Rob Murphy Heating provide maintenance services?

Yes — they do repair and maintenance for renewable and conventional heating systems.

What areas does Rob Murphy Heating serve?

Their website does not specify exact service zones; you may need to contact them to confirm whether they serve your location.

Get a Free Solar Quote

Interested in Seven Hills Solar? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.