Liverpool

Sefton Solar

Sefton Solar designs and installs solar systems for homes & businesses, offering quality and service to harness clean energy reliably.
★★★★★  
5
👥
8
Reviews
🏆Elite+ Installer

About

Sefton Solar is a UK-based renewable energy company providing professional solar PV installations, battery storage, and sustainable energy solutions for both residential and commercial clients. With a focus on quality, affordability, and customer satisfaction, the company helps households and businesses cut energy costs, achieve energy independence, and contribute to a cleaner, greener future.

The mission of Sefton Solar is to make renewable energy accessible and practical for everyone, offering tailored solar solutions designed to meet individual client needs. Their vision is to support the UK’s net zero transition by delivering efficient, reliable, and cost-effective energy systems that reduce reliance on fossil fuels.

With a team of skilled engineers and renewable energy specialists, Sefton Solar provides end-to-end services, from consultation and bespoke system design to installation and long-term maintenance. The company is recognized for its professional approach, transparency, and commitment to delivering value-driven solutions that stand the test of time.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar energy systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Solar panel servicing and maintenance

✔️ Energy audits and consultation

✔️ Flexible financing and renewable support options

Products & Manufacturers

Sefton Solar works with globally recognized renewable energy manufacturers to ensure performance and reliability:

  • Solar Panels: Trina Solar, Q CELLS, JA Solar, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

173 College Rd, Crosby, Liverpool L23 3AT, United Kingdom
44 151 622 0326
hello@seftonsolar.com

Service Areas

Liverpool

Certifications

Sefton Solar operates with or in line with recognized UK industry certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV systems.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – consumer rights and ethical practices.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Sefton Solar provides warranties aligned with UK solar best practices:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Several years of renewable energy industry experience in the UK

Projects Completed

Dozens of residential and commercial solar installations successfully delivered

Customer Reviews

Read what our customers have to say about their experience with Sefton Solar Solar Solutions

Sefton Solar weren't the cheapest quote I got but they were the best quote. They have excellent post installation support. I now have a superb tariff from Octopus Energy which maximizes the benefits from my installation. My only regret is that I didn't install the extra two panels I could have fitted on my roof. Even with the drop in electricity costs, the payback is less than 10 years which is much better than money invested in an ISA savings account. I would definitely recommend going solar with batteries and also going solar with Sefton Solar.

Mark McCarthy

I needed a reputable company to fit my new Solar Panels. Sefton Solar did a fantastic job. I can thoroughly recommend this company. They were very professional, hard working and courteous. They did a first class job, explaining how everything worked before they left. Leaving my home clean and tidy.

Francis Coghlan

George from Sefton Solar fitted battery pack and new converter for our solar panels. He came back to fit a heat detector and linked it to the smoke alarms. He also fitted and cooling fan.He worked like a Trojan.He did a great job, very much appreciated.We would highly recommend him to anyone.

Suzanne Gallagher

Frequently Asked Questions

What areas does Sefton Solar serve?

Public directories list Sefton Solar among installers in the Sefton area (Merseyside).

Is Sefton Solar a legitimate solar installer?

It appears in listings of local solar / renewable installers in Sefton area; however detailed company records are not readily visible. (You may need to check Companies House or local business registration.)

What financing options does Sefton Solar provide?

No public information found on their financing options; you may need to contact them directly to inquire.

Get a Free Solar Quote

Interested in Sefton Solar? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.