London

Samso Energy

Samso Energy supports renewable energy integration with innovative energy storage and management solutions, maximizing solar and wind usage for sustainable power supply.
★★★★★  
5
👥
106
Reviews
🏆Elite+ Installer

About

Samso Energy is a London-based renewable energy company dedicated to delivering high-quality solar PV installations, battery storage, and sustainable energy solutions. With a 4.6-star rating from over 100 customer reviews, the company is recognized for excellent service, product quality, and customer care.

Their mission is to make renewable energy accessible and practical for homeowners and businesses alike, helping clients lower energy costs, achieve energy independence, and reduce their carbon footprint. Samso Energy offers bespoke solar solutions tailored to each project, ensuring maximum performance, safety, and long-term reliability.

With strong ratings across product quality (8.5), installation and service (8.5), and customer reviews (8.8), Samso Energy has established itself as a trusted solar provider in London. Their vision is to accelerate the UK’s transition to a greener future by empowering communities and businesses with clean, cost-effective, and future-proof energy systems.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Solar system servicing and maintenance

✔️ Energy efficiency consultation

✔️ Financing and renewable support options

Products & Manufacturers

Samso Energy partners with reliable renewable energy manufacturers to ensure long-lasting results:

  • Solar Panels: Trina Solar, Q CELLS, JA Solar, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Kopshop, 6 Old London Rd, Kingston upon Thames KT2 6QF, United Kingdom
441962462151
contact@samsosolar.co.uk

Service Areas

London

Certifications

Samso Energy operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – ensuring certified solar installations.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – consumer protection and ethical practices.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Samso Energy offers warranty coverage consistent with industry standards:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.

Company Details

Languages Spoken

English

Years in Business

Several years of renewable energy expertise in the UK

Projects Completed

Dozens of residential and commercial solar projects delivered

Customer Reviews

Read what our customers have to say about their experience with Samso Energy Solar Solutions

Very good company from the first appointment, through to the panels being fitted. The electrician (sorry I cannot remember his name) was absolutely great as he had more work than thought, but just got on with it. Everyone cleaned up after themselves and it was all fitted and completed alot quicker than we thought. The battery fits nicely in the hall, and does what is says on the tin. So a big thank you to all the staff, office staff included. David & Ruth.

Ruth Bennett

I had an outstanding experience with Samso Renewables for the installation of solar panels at my home. From start to finish, their team demonstrated professionalism, expertise, and dedication to customer satisfaction. The process was seamless and efficient, and the results exceeded my expectations. The team at Samso Renewables provided clear explanations and guidance throughout, answering all my questions and ensuring I understood the system's benefits and functionality. The installation itself was carried out with precision and care, and their attention to detail was remarkable.

Lance

From my very first call with the sales team to the final check-in after installation, I couldn’t fault the company, their staff, or the product. My home came with a few non-standard challenges, but thanks to the team’s expertise and support, we worked through them quickly and smoothly. The information I was given about expected solar output was clear and importantly completely accurate.

Daniel Macdonald

Frequently Asked Questions

How do I choose a reliable solar company like Samso Energy?

Samso Energy is accredited, experienced, and committed to providing high-quality renewable energy solutions.

Does Samso Energy offer free quotes or consultations?

Yes, they provide free initial consultations to help customers understand costs and system benefits.

How much can I save with solar from Samso Energy?

Their solar installations are designed to reduce electricity bills significantly and deliver strong long-term savings.

Get a Free Solar Quote

Interested in Samso Energy? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.