Bristol

Rygol Electrical & Renewables

Rygol Electrical & Renewables combines electrical contracting with solar and battery installations, providing holistic clean energy services.
★★★★★  
5
👥
135
Reviews
🏆Elite+ Installer

About

Rygol Electrical & Renewables is a UK-based company offering a comprehensive range of electrical services and renewable energy solutions, including solar PV installations, battery storage, and EV charging. With a foundation in professional electrical contracting, the company has successfully expanded into the renewable energy sector, delivering high-quality, future-ready systems for both residential and commercial clients.

Their mission is to provide safe, efficient, and cost-effective energy solutions that help customers cut energy bills, increase energy independence, and reduce carbon footprints. Rygol Electrical & Renewables takes pride in delivering tailored solutions designed to meet the unique needs of each client, from small-scale domestic projects to large commercial installations.

With a skilled team of qualified electricians and renewable energy experts, the company offers end-to-end services, including consultation, design, installation, and maintenance. Their vision is to play a vital role in supporting the UK’s clean energy transition by offering sustainable, affordable, and reliable energy systems backed by strong customer service.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Full electrical contracting services

✔️ Solar system servicing and maintenance

✔️ Energy efficiency consultation

Products & Manufacturers

Rygol Electrical & Renewables works with globally recognized manufacturers to ensure quality and reliability:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

7 Soundwell Rd Staple Hill, Bristol BS16 4QG
44 117 313 7644
sales@rygol.co.uk

Service Areas

Bristol

Certifications

Rygol Electrical & Renewables operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV systems.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – consumer protection and ethical business practices.
  • ISO 9001/14001 – quality and environmental management standards.

Warranty Information

Rygol Electrical & Renewables provides warranty coverage in line with industry standards:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Several years of expertise in electrical contracting and renewable energy

Projects Completed

Dozens of residential and commercial projects successfully delivered across the UK

Customer Reviews

Read what our customers have to say about their experience with Rygol Electrical & Renewables Solar Solutions

We recently had a full solar installation carried out by Rygol Electrical & Renewables, and we couldn't be happier with the service from start to finish. The whole process was incredibly smooth—super quick turnaround and everything completed far sooner than we expected.

Paul Rubery

I have used Rygol on numerous occasions and cannot fault them.They offer a reliable, thorough and friendly service. Last week I had to get them out for an emergency and Ben came over to our shop after business hours and found the fault. I would highly recommend.

Sally Roberts

The EV charger was installed neatly and professionally in the desired location by Ben. He ensured the charger and the app were correctly set up, worked through poor weather, and arrived punctually. Great job Ben, Thanks Rygol

Phil Wong

Frequently Asked Questions

What certifications should Rygol hold?

Rygol is MCS certified and HIES accredited, and also advertises NICEIC approval.

How long does Rygol take to install a system?

They indicate they can install within 4 weeks of order.

What financing options does Rygol provide?

Rygol offers finance over 3–10 years, with representative APR ~11.9%.

Get a Free Solar Quote

Interested in Rygol Electrical & Renewables? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.