Birmingham

Ra Solar

Ra Solar offers solar PV design, installation and support, helping users reduce bills and carbon footprints with efficient solutions.
★★★★★  
5
👥
1
Reviews
🏆Elite+ Installer

About

Ra Solar is a UK-based renewable energy company specializing in the design and installation of solar PV systems, battery storage, and EV charging solutions for both residential and commercial clients. With a focus on quality, sustainability, and customer satisfaction, Ra Solar delivers tailored renewable energy systems that help customers save money, increase energy independence, and contribute to reducing carbon emissions.

The mission of Ra Solar is to empower households and businesses to transition to clean energy by providing affordable and efficient solar technologies. Their vision is to play a significant role in the UK’s journey to net zero by enabling communities to embrace renewable energy solutions that are both practical and future-ready.

With a skilled team of engineers and renewable specialists, Ra Solar provides end-to-end services, including consultation, design, installation, and maintenance. Known for professionalism, transparency, and a customer-first approach, the company has established itself as a trusted renewable energy partner across the UK.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging point installations

✔️ Solar panel maintenance and servicing

✔️ Energy consultation and audits

✔️ Financing and renewable support

Products & Manufacturers

Ra Solar works with leading renewable energy manufacturers to ensure performance and reliability:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, Sonnen, LG Chem, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

First Floor, 16, SF No. 466 / 2,Natham Road, Ponnagaram,Dindigul – 624 003.
44 121 798 1578
info@rasolar.in

Service Areas

Birmingham

Certifications

Ra Solar operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – ensuring electrical safety compliance.
  • RECC (Renewable Energy Consumer Code) – consumer protection and ethical business practices.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Ra Solar provides warranty coverage aligned with UK solar industry standards:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Several years of experience in renewable energy installations

Projects Completed

Dozens of residential and commercial projects successfully delivered across the UK

Customer Reviews

Read what our customers have to say about their experience with Ra Solar Solar Solutions

Frequently Asked Questions

What types of solar panels does RA Solar use?

RA Solar installs a variety of high-quality solar panels from leading manufacturers, and all products they supply are MCS certified.

How long does RA Solar take to install a system?

For domestic (residential) installs, RA Solar typically completes the installation in 1 to 3 days, depending on the system size and complexity.

What areas does RA Solar serve?

RA Solar Energy Systems Limited is a UK-registered company (Company no. 06561587). Companies House Additional service area information is not clearly indicated publicly, so you should contact the company to confirm their coverage zone.

Get a Free Solar Quote

Interested in Ra Solar? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.