Liverpool

Quantum Solar UK

Quantum Solar UK offers expert solar PV, energy storage & EV charging installations across the UK, turning rooftops into clean energy assets.
★★★★★  
5
👥
15
Reviews
🏆Elite+ Installer

About

Quantum Solar UK is a renewable energy company specializing in solar PV systems, battery storage, and EV charging solutions for residential and commercial clients across the UK. Known for its innovative approach and strong customer focus, Quantum Solar UK provides tailored renewable energy solutions designed to help clients reduce electricity bills, cut carbon emissions, and achieve long-term energy independence.

The mission of Quantum Solar UK is to deliver high-quality solar installations that combine cutting-edge technology with expert engineering, ensuring maximum efficiency and long-term performance. Their vision is to play a leading role in the UK’s transition to clean energy, supporting households and businesses in embracing renewable solutions that are both cost-effective and sustainable.

With a dedicated team of renewable energy specialists, Quantum Solar UK offers end-to-end services including consultation, system design, professional installation, and aftercare. By prioritizing customer satisfaction and transparency, the company has quickly established itself as a reliable partner in the UK’s growing renewable energy sector.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging station installations

✔️ Solar system maintenance and servicing

✔️ Energy efficiency consultation

✔️ Flexible financing and renewable support

Products & Manufacturers

Quantum Solar UK partners with leading global manufacturers to ensure long-lasting system performance:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, Sonnen, LG Chem, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Penny Lane Business Centre, 374 Smithdown Road, Liverpool, United Kingdom
44 7743 288688
Contact@quantumsolaruk.com

Service Areas

Liverpool

Certifications

Quantum Solar UK operates with or in line with recognized UK renewable certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – ensuring compliance with electrical safety regulations.
  • RECC (Renewable Energy Consumer Code) – fair trading and consumer protection.
  • ISO 9001/14001 – quality and environmental management standards.

Warranty Information

Quantum Solar UK provides warranties in line with UK solar industry practices:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Several years of operation in the UK renewable energy market

Projects Completed

Dozens of residential and commercial solar projects completed successfully

Customer Reviews

Read what our customers have to say about their experience with Quantum Solar UK Solar Solutions

We contracted Quantum Solar to provide and install solar panels and battery backup. We live on an island way up north and Quantum were one of the very few prepared to come here.The experience was first rate from start to finish. Lisa took the time to understand what we wanted and designed a solution exactly matched to our needs. Then when a better battery product became available after we'd signed the contract Quantum Solar suggested we had this instead at the same price. We agreed willingly.

Martin Greaves

Hello, I wanted to share my opinion about Quantum Solar. They installed 12 solar panels, a 5kwh inverter, a 10kwh battery and an EV charger. Everything except the panels is from Fox. I am very pleased with their approach to the customer, expert advice and response to every change. Andy is very nice and professional. In terms of price, this company is very competitive and I did not find a cheaper one that offered me a set in such a configuration as mine. The work was very efficient. I do not know if this is normal practice but I paid only after the work was completed. From my experience with them, I can highly recommend Quantum Solar and I will definitely advertise them to my friends and acquaintances.

krzysztof skok

Quantum Solar quoted for 16 pv ground mounted pv panels, 10KW battery 3phase inverter.The property is late nineteenth century and presented many challengesThe price was the most competitiveThe Quantum team persevered and worked with us to agree an optimum installation.On completion the final price was in line with the quote and we are very satisfied.

Colin Leighton

Frequently Asked Questions

What services does Quantum Solar UK provide?

Quantum Solar UK offers solar PV installations, battery storage, EV charging point installations, and air source heat pumps.

Does Quantum Solar UK offer free quotes or consultations?

Yes — their site encourages customers to “Book a free quote” or “Request a free quote or advice.”

How long has Quantum Solar UK been in business?

The parent entity “Quantum Solar Limited” was incorporated on 2 August 2022.

Get a Free Solar Quote

Interested in Quantum Solar UK? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.