Leicester

Pristine Panels

Pristine Panels installs and maintains high-efficiency solar PV systems with meticulous care, ensuring customers get reliable and optimized solar returns.
★★★★★  
5
👥
9
Reviews
🏆Elite+ Installer

About

Pristine Panels is a UK-based renewable energy and solar solutions company specializing in solar PV installations, battery storage systems, and EV charging solutions. The company is committed to delivering high-quality, efficient, and sustainable energy systems that help customers reduce electricity bills, achieve energy independence, and lower their carbon footprint.

The mission of Pristine Panels is to make solar energy simple, reliable, and cost-effective for both homeowners and businesses. Their vision is to support the UK’s clean energy transition by empowering communities with renewable technologies that deliver long-term environmental and financial benefits.

With a skilled team of engineers and renewable specialists, Pristine Panels offers end-to-end services including consultation, system design, installation, and aftercare. Known for professionalism, transparency, and customer care, the company ensures every project is tailored to meet client needs and installed to the highest standards of safety and performance.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging station installation

✔️ Solar panel cleaning and maintenance

✔️ Energy efficiency consultation

✔️ Flexible financing and renewable support options

Products & Manufacturers

Pristine Panels works with trusted global renewable manufacturers to ensure long-term performance:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

44 7709 837199
Pristinepanels1@gmail.com

Service Areas

Leicester

Certifications

Pristine Panels operates with or in line with recognized UK certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – compliance with electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – consumer rights and ethical business practices.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Pristine Panels provides warranties in line with industry best practices:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Several years of renewable energy and solar installation expertise

Projects Completed

Dozens of residential and commercial installations across the UK

Customer Reviews

Read what our customers have to say about their experience with Pristine Panels Solar Solutions

Ben and Rhys from Pristine Panels came to clean my 4 solar panels and they cleared my gutters at the same time. I have had ongoing issues with my solar panels which Ben confirmed was due to the amount of dirt and debris attached to them, only to realise that I have pigeons laying nests underneath. They did a fantastic job and now my solar panels are running back at what they originally were when I had them installed. I am now booked in for bird blocking at the end of the month.Thank you very much pristine panels and I look forward to seeing you again.

Kerry Ely-Simpson

Good job cleaning my solar panels which have been up for long time without being cleaned before. They look a lot better . Thanks to you both for a cracking job, and explaining a few things about my solar panels . Would recommend Pristine Panel to anyone who needs the solar panel cleaning.

Denise

We don’t usually write up reviews but the service we’ve received from Pristine Panels has been absolutely fantastic. We hired Ben & Reece to clean up our backyard/garden, and they left our garden looking brand new! The decking, patio, fences and even the front side of our house has been left shining! We highly recommend their services and will be using them again for sure! Brilliant job, very happy customers, Thankyou!

Yaz

Frequently Asked Questions

How long has Pristine Panels been in business?

Pristine Panels claims over 15 years of experience in solar installation, maintenance, and upkeep.

Does Pristine Panels serve nationwide?

Yes — while based in Leicestershire, they state they extend services across the United Kingdom via franchises in key locations.

What types of services does Pristine Panels provide?

They offer solar installation, regular maintenance, and upkeep solutions for residential & commercial customers.

Get a Free Solar Quote

Interested in Pristine Panels? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.