
Polygon Installations is a UK-based renewable energy and electrical services company, specializing in solar PV installations, battery storage systems, and energy-efficient technologies. With a reputation for high-quality workmanship and customer-focused service, the company delivers tailored energy solutions that help both residential and commercial clients reduce costs, cut carbon emissions, and move toward energy independence.
The mission of Polygon Installations is to make clean energy affordable and accessible while maintaining the highest standards of safety and reliability. Their vision is to support the UK’s transition to renewable energy by providing innovative and future-proof solar technologies.
With a team of skilled engineers and technicians, Polygon Installations provides complete end-to-end solutions, including consultation, system design, installation, and ongoing aftercare. Known for professionalism and transparency, the company has built strong relationships with its clients by offering reliable and long-lasting renewable energy systems.
Polygon Installations works with trusted renewable energy manufacturers to ensure reliable performance and long-term value:



Polygon Installations operates with or in line with the following certifications:
Polygon Installations provides warranties consistent with UK solar industry practices:
English
Several years of operation in the renewable energy and electrical services industry
Dozens of residential and commercial renewable projects successfully delivered across the UK
Very pleased with the service provided. My windows and composite door were all fitted within 3 weeks as promised. I had 2 other quotes and theirs was the most competitive. Saf the sales rep that came to see me initially was very knowledgable and answered all my questions patiently and made us feel at ease. No pushy sales. Will be recommending to all my family and freinds.
They installed double-glazed windows and a new front door which have totally transformed the house. The whole process was handled very professionally and as quoted for. Thank you for the great service.
Thankyou for the amazing windows. Was worried but the whole experience was first class. The isnstallers arrived on time and were very professional. My neighbours will also be calling in to get their windows from you.
According to Companies House, Polygon Installations Ltd is listed but currently marked as dissolved.
The company registration shows historical filings and a name change history, but given its dissolved status, it may no longer operate.
There is no clear public record of a free quote service currently in operation — if the company is inactive, this may no longer be offered.