Leicester

Plumb Solar

Plumb Solar specializes in designing and installing solar PV systems, helping property owners reduce energy bills with clean, efficient solutions.
★★★★★  
5
👥
15
Reviews
🏆Elite+ Installer

About

Plumb Solar is a UK-based renewable energy company specializing in solar PV installations, solar thermal systems, and battery storage solutions for residential and commercial clients. Combining expertise in plumbing, heating, and renewable energy technologies, the company provides integrated solutions that deliver both energy efficiency and long-term sustainability.

The mission of Plumb Solar is to provide high-quality, affordable renewable energy systems that help customers cut energy costs, achieve independence from rising fuel prices, and reduce their environmental impact. Their vision is to promote a greener future by making clean energy accessible and practical for households and businesses across the UK.

With years of experience and a customer-first approach, Plumb Solar offers tailored solar and heating solutions, from consultation and design through to installation and aftercare. The company has earned a reputation for professionalism, reliable workmanship, and transparent service, making it a trusted partner in the renewable energy sector.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar energy systems

✔️ Solar thermal hot water systems

✔️ Battery storage integration

✔️ EV charging point installations

✔️ Plumbing and heating services

✔️ Solar maintenance and servicing

✔️ Energy consultation and audits

Products & Manufacturers

Plumb Solar partners with leading renewable energy brands to ensure efficiency and reliability:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • Solar Thermal: Kingspan, Worcester Bosch, Vaillant
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

44 7834 810798
sales@plumbsolar.co.uk

Service Areas

Leicester

Certifications

Plumb Solar operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV and thermal systems.
  • NICEIC – electrical safety compliance.
  • Gas Safe Register – certified heating and plumbing expertise.
  • RECC (Renewable Energy Consumer Code) – consumer protection and ethical practices.
  • ISO 9001/14001 – quality and environmental management standards.

Warranty Information

Plumb Solar provides warranties consistent with industry standards:

  • Solar panels – 20–25 years performance warranty.
  • Solar thermal systems – 5–10 years product warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on product.

Company Details

Languages Spoken

English

Years in Business

Several years of renewable and heating system expertise

Projects Completed

Dozens of residential and commercial solar and thermal projects completed across the UK

Customer Reviews

Read what our customers have to say about their experience with Plumb Solar Solar Solutions

Frequently Asked Questions

How long has Plumb Solar been in business?

They have been installing, servicing and repairing solar hot water / thermal systems since 2007.

What services does Plumb Solar offer?

They offer solar hot water / solar thermal installations, service & repair, general plumbing, unvented cylinders, underfloor heating.

What geographic area does Plumb Solar cover?

They operate in Leicestershire and the East Midlands region.

Get a Free Solar Quote

Interested in Plumb Solar? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.